Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
2006We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.
1954how we can calculate the range selection time in mobile communication? or channel searching time?
2247Q.Large no of thyristors are used in HVDC transmission to improve______ a) current rating b) voltage rating c) Thyristers are available at high ratings d)
5 8705If the time delay of relay with TMS setting 0.1 is 10 sec, then what is the time delaty when the TMS setting is changed to 0.5
1 5957Which type of power plant is more easier to produce electrical power at economical condition?
8 11026Post New HAL Interview Questions
How do I create a substring in excel?
What are classloaders?
What is a header in code?
What is the use of teradata system software?
what is nonclustered index
What is the difference between productivity and productive system?
I have a table called 'test' on source and target with same name, structure and data type but in a different column order. How can you setup replication for this table?
Is apache spark an etl tool?
What is synthesize in ios?
What is angular and why use it?
How can one make the most of drupal? What are the main advantages?
Which sorting method is slowest?
How do you combine formulas?
is oil viscosity affect on motor current?
What is the difference between router and filter?