With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2451Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1913Post New Power Plant Interview Questions
Operation of isolators.
How to start your 10g xe server?
How do I do a clean install of wordpress?
Difference between dependencies and dev dependencies?
what are the different types of SSRS reports?
Design database draw er diagram for a certain scenario ?
What is Unit in Scala? What is the difference between Java’s void and Scala’s Unit?
Clarify how you can maintain a strategic distance from un-vital logging data from being put away?
What do you mean by purchasing organization hierarchy ?
Explain what’s a signal? Explain what do I use signals for?
what is meant by managed properties?
What is the formula to find out two phase active & reactive power
Enlist the operation types response used in wsdl?
Are data structures important?
Explain the integration points between pm and mm/fico during the pm configuration?