With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2428Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1880Post New Power Plant Interview Questions
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
How is data stored in a relational database?
In the ecological study of food interactions how are the autotrophic beings called?
What is the correct syntax when we define XML version?
what is differences between ferrock and concrete ?
What is exception in java?
What do you understand by Eigenvectors and Eigenvalues?
How do I open the shell prompt?
How do you make a thread in java?
What will happened if the neutral of the (star connected secondry) Xformer disconnected? (if its Above KVA rated one)
Define what is carbide?
Explain the importance of finalize() method.
What are the benefits of data processing according to you?
What are the Internet tools available in VB 6.0?
What is sound velocity?