With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
1937Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1395Post New Power Plant Interview Questions
Why it is called ioc in spring?
What does break text mean?
What is css script?
How many types of constructors are there ? What are they ?
Explain process spawning?
WHY IGBT IS CALLED MINORITY CARRIER DEVICE?
Can u please post some questions of MTNL junior telecom officer exam?
Assuming {et} is randomly drawn from N(0,1) and e0 = 0, generate 200 observations of xt = et − 0.5e(t−1) and draw a line graph of xt.
What kind of music is flume?
What is the alloy of tin and lead?
What is spark catalyst?
What is ms-dos & why it is used for?
request parameter how to find whether a parameter exists in the request object?
What is the difference between left and right outer join?
How do you define equipment/material loaned/leased to a customer?