With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
1937Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1395Post New Power Plant Interview Questions
List the key components of hibernate.
Does anyone have best practices for daily backup &restore process for qc 11 ?
Is the jquery library used in angular?
How to switch to a previously used directory?
Explain how to convert a report into excel sheet.
How does one create an action in struts 2?
How do signed and unsigned numbers affect memory?
Tell me what is ale, idoc, edi, rfc and explain briefly?
Is There Any Difference In Cloud Computing And Computing For Mobiles?
What are the different ways of defining array sizes?
What is plugin setting?
How to check if a variable is an integer in javascript ?
What is adt and its advantages?
What is inheritance write a program to show use of inheritance?
What is gap between teeth?