With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2417Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1871Post New Power Plant Interview Questions
What is mysql default port number?
What is a premium?
What is ctrl m character?
Anaconda is a wikipedia programming language?
What happen when we delete the table using trigger?
Two tables emp(empid,name,deptid,sal) and dept(deptid,deptname) are there.write a query which displays empname,corresponding deptname also display those employee names who donot belong to any dept.
Wt is the unit test and how will u done this unit test? Wt r the results did u get?
How do I restore a mysql database dump file in linux?
What are the advantages of using macro in c language?
What is numpy? Is it better than a list?
What is managed bean in jsf (javaserver faces)?
What is volumatric air change of a HOT GAS GENERATOR of a STEAM BOILER ?
What are the different test techniques used in functional testing?
What is codeigniter php?
What are the different sections of the script? In what sequence do these sections run?