With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2397I am called for interview from north east power plant .so, I need some interview question which may help me.
1736Post New Power Plant Civil Engineering Interview Questions
How do you convert stl to steps?
hi any body pls give me company name interview conduct "c" language only
Can I use the AssignPrn method to write directly to a port?
Is AWS redshift is one of the RDS in AWS or is it Relation Database?
Where is the sort option in word?
Host and Agent are the component associated with which tool?
What are the types of records that are transferred to sap r/3 and used by interfaces? : abap bdc
Is it possible to retrieve all tables along with all the data?how?
What is a bjt? What are its advantages and disadvantages?
entry for cash received from debtors
Differentiate between namespace and assembly.
What is ivy renderer in angular 6?
how to drop an existing index in mysql? : Sql dba
What is the difference between Force.com and Salesforce.com?
What are the cookies in angular 2?