With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
1937Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1393Post New Power Plant Interview Questions
How to calculate mf when meter equipment and meter are connected
How to use 'foreach' operation in pig scripts?
How do I get started with search engine marketing activities?
Explain two easy sql optimizations.
How was xml created?
What do you mean by list price in product catalog?
How many disk partitions should I have?
What are the faults that might happen in SCADA ?
How do I find usb devices on linux?
what is the size ur source like(file system or database)? how many record daily come u r banking project?
All of the following are true regarding the tools and techniques of Activity Sequencing except: A. GERT uses analogous methods. B. GERT allows for loops. C. GERT is a conditional diagramming method. D. GERT allows for conditional branches.
What is session start?
Explain the properties in index and types of index?
Why Amazon? How is it different from its competitors?
Tell us about your financial condition