With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2442Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1891Post New Power Plant Interview Questions
What are deployment descriptors?
Do you know what are pure virtual functions?
How to retrieve values out of an array?
What is qlikview developer? What is its role in architecture?
What are the types of input forms that can be created for a workflow ?
What table do I use in creating abap program that would output the sales based on sales organization of customers?
What is a one time customer?
an advertiser wants to increase clickthrough rate (ctr). Which would help to eliminate irrelevant impressions?
What are 3 important segments of a presentation?
What is mean by Data Driven framework in QTP? Can any one answer me in details on this regard.
What is typescript declare keyword?
Does facebook use python?
What are b-trees?
Bpc for nw need to install .net application server and web server or not?
Hive new version supported Hadoop Versions ?