With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2499Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1960Post New Power Plant Interview Questions
Can we create master detail relationship on existing records?
What is the maximum timeout we can set for Cookies?
What is semi-supervised Machine Learning?
Is there any way by which we can stop the network from attaching further materials after it is released?
Suppose your client wants to ensure only specific users can create reports in query studio with other users creating reports using report studio. How can this be accomplished?
What are the different storage options with Azure?
What is postgresql?
What are the disadvantages of artificial neural networks?
How do you make use of arrays in python?
What is difference between view and materialized view?
How to get nth highest salary from employee table.
Howmany interface you have developed?
What are the Advantages of using backbone.js?
How do I make outlook open automatically in windows 10?
write a C program: To recognize date of any format even formats like "feb-02-2003","02-february-2003",mm/dd/yy, dd/mm/yy and display it as mm/dd/yy.