Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Cadence aptitute test questions (5)
  • Cadence interview questions (4)
  • Cadence placement papers (3)
  • Cadence technical test questions (9)



Cadence Interview Questions
Questions Answers Views Company eMail

Which of following is used for back-up files? (a) compress (b) Tar (c) make (d) all the above

1 2904

what does find command do ?

3 4616

what does exit() do?

3 6309

what is the value of 'i'? i=strlen("Blue")+strlen("People")/strlen("Red")-strlen("green")

7 7453

prototype of sine function.

2 5072





how many flip flops you require for modulo 19 counter

16 39922

ring counter's initial state is 01000. after how many clock cylces will it return to the initial state.

8 16177

A signed no is stored in 10-bit register, what is the max and min possible value of the number.

6 10533

plase help me out in pcb design intreview question and answers

1021

Post New Cadence Interview Questions



Un-Answered Questions

what do you know that m20,m25

451


8. Oop-Why and were we use Interfacse and Abstract class.

872


What type of metrics would you use?

857


What are the properties of a good requirement?

648


why we can use dust in concrete insted of fly ash

710






Can anyone post the SAP-Project systems interview questions.

2108


What is the application of Dyn1 and Dyn11 vector group of transformer?

1472


What is the difference between PLC and DDC?

613


How do you size NMOS and PMOS transistors to increase the threshold voltage?

1504


where is the reject loader .

458


wtat type quations will be sak in ongc exam?

1798


important question on stones

615


HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT SWITCH BOARD,MLDB,ACB,BUSBAR,ETC...?

2562


I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.

453


why you are interested in F&B service

115






Cadence Interview Questions
  • C (4)
  • Windows AllOther (1)
  • Operating Systems AllOther (1)
  • SAP Basis (1)
  • Electronics Communications (5)
  • General Aptitude (5)
  • Puzzles (1)
  • Placement Papers (3)