What is Rendezvous point? When u apply this?
Answers were Sorted based on User's Feedback
Answer / la1yacreations
Rendevous Point instructs vusers to wait till all vusers
come to certain point and proceed together.
The propose of using rendevous point is to see how the
Particular transaction of the Application responds with
loads.
Is This Answer Correct ? | 15 Yes | 0 No |
Answer / senthil
Rendezvous point is used to emulate concurrent users load
for particular transaction. [For Eg: 1000 users deposit at
same time in an banking application]. This will instruct
the fast Vusers to wait until all other users to arrive at
a point and then proceed, so that all Vusers perform the
transaction at same time.
Is This Answer Correct ? | 11 Yes | 0 No |
Answer / jayanthi
rendezvous pt means v use vuser in the loadrunner all the
vuser meetingin a certain poit
Is This Answer Correct ? | 7 Yes | 1 No |
Answer / sivas
Redezvous point is used in Load Runner when we do
performance Testing.
Is This Answer Correct ? | 1 Yes | 12 No |
where do you memory leaks logs
where we can see the graphs in Loadrunner when it is use ? (Chandana)
What should be done to view parameter substitution in the execution log?
Explain the difference between automatic correlation and manual correlation?
Which loadrunner component does the recording of performance test scenario?
What is visual recorder in Load Runner?
to upload the data into xl sheet we will use CSV doc but where we will get the CSV doc what is the procedure plzz explain realtime employees? thanks in advance
When a business transaction, is run in LR and QTP (the response time= same for both 2 sec , No of user = 1). Which tool would you opt for???
which is the best institute to learn load runner in hyderabad?
How do you perform functional testing under load?
Explain about 90th percentile?
How will you stop the execution of a script on error?