can you ple give me Quality Center interview questions and
answer

Answers were Sorted based on User's Feedback



can you ple give me Quality Center interview questions and answer..

Answer / nagamani

1. What is meant by test lab in Quality Centre?
Test lab is a part of Quality Centre where we can execute
our test on different cycles creating test tree for each
one of them. We need to add test to these test trees from
the tests, which are placed under test plan in the project.
Internally Quality Centre will refer to this test while
running then in the test lab.

2. Can you map the defects directly to the requirements(Not
through the test cases) in the Quality Centre?
In the following methods is most likely to used in this
case:
Create your Req.Structure
Create the test case structure and the test cases
Map the test cases to the App.Req
Run and report bugs from your test cases in the test lab
module.

The database structure in Quality Centre is mapping test
cases to defects, only if you have created the bug from
Application. test case may be we can update the mapping by
using some code in the bug script module(from the customize
project function), as per as i know, it is not possible to
map defects directly to an requirements.

3. how do you run reports from Quality Centre. Does any one
have good white paper or articles?
This is how you do it
1. Open the Quality Centre project
2. Displays the requirements modules
3. Choose report
Analysis > reports > standard requirements report

4. Can we upload test cases from an excel sheet into
Quality Centre?
Yes go to Add-In menu Quality Centre, find the excel add-
In, and install it in your machine.
Now open excel, you can find the new menu option export to
Quality Centre. Rest of the procedure is self explanatory.

5. Can we export the file from Quality Centre to excel
sheet. If yes then how?
Requirement tab– Right click on main req/click on
export/save as word, excel or other template. This would
save all the child requirements

Test plan tab: Only individual test can be exported. no
parent child export is possible. Select a test script,
click on the design steps tab, right click anywhere on the
open window. Click on export and save as.

Test lab tab: Select a child group. Click on execution grid
if it is not selected. Right click anywhere. Default save
option is excel. But can be saved in documents and other
formats. Select all or selected option

Defects Tab: Right click anywhere on the window, export all
or selected defects and save excel sheet or document.

6. How many types of tabs are there in Quality Centre.
Explain?
There are four types of tabs are available

1. Requirement : To track the customer requirements
2. Testplan : To design the test cases and to store the
test scripts
3. test lab : To execute the test cases and track the
results.
4. Defect : To log a defect and to track the logged defects.

7. How to map the requirements with test cases in Quality
Centre?
1. In requirements tab select coverage view
2. Select requirement by clicking on parent/child or
grandchild
3. On right hand side(In coverage view window) another
window will appear. It has two tabs
a) Tests coverage
b) Details
Test coverage tab will be selected by default or you click
on it.
4. Click on select tests button a new window will appear on
right hand side and you will see a list of all tests. You
cans elect any test case you want to map with your
requirements.

8. How to use Quality Centre in real time project?
Once completed the preparing of test cases
1. Export the test cases into Quality Centre( It will
contained total 8 steps)
2. The test cases will be loaded in the test plan module
3. Once the execution is started. We move the test cases
from test plan tab to the test lab module.
4. In test lab, we execute the test cases and put as pass
or fail or incomplete. We generate the graph in the test
lab for daily report and sent to the on site (where ever
you want to deliver)
5. If we got any defects and raise the defects in the
defect module. when raising the defects, attach the defects
with the screen shot.

9. Difference between Web Inspect-QA Inspect?
QA Inspect finds and prioritizes security vulnerabilities
in an entire web application or in specific usage scenarios
during testing and presents detail information and
remediation advise about each vulnerability.
Web Inspect ensures the security of your most critical
information by identifying known and unknown
vulnerabilities within the web application. With web
Inspect, auditors, compliance officers and security experts
can perform security assessments on a web enabled
application. Web inspect enables users to perform security
assessments for any web application or web service,
including the industry leading application platforms.

10. How can w add requirements to test cases in Quality
Centre?
Just you can use the option of add requirements.
Two kinds of requirements are available in TD.
1. Parent Requirement
2. Child requirements.

Parent Requirements nothing but title of the requirements,
it covers high level functions of the requirements

Child requirement nothing but sub title of requirements, it
covers low level functions of the requirements.

Is This Answer Correct ?    52 Yes 7 No

can you ple give me Quality Center interview questions and answer..

Answer / swathi

Yes

Is This Answer Correct ?    17 Yes 4 No

can you ple give me Quality Center interview questions and answer..

Answer / srinu

Thanks a lot Nagamani Garu

Is This Answer Correct ?    9 Yes 3 No

can you ple give me Quality Center interview questions and answer..

Answer / vijayvardhan

we are very thank full to you...

Is This Answer Correct ?    4 Yes 0 No

can you ple give me Quality Center interview questions and answer..

Answer / deven mehta

What are the types of graphs and reports in QC?

Progress graphs are available for all tables.
Summary graphs are available for all tables.
Test lab has additional graphs
-cross test set progress
-cross test set summary
Defects table also has Age graphs
Reports
-standard reports
-Document generator
-snapshots
-full reports
1 What web client can be used with Quality Center 9.2?
A. Netscape
B. Safari
C. Firefox
D. Internet Explorer
Answer: D
2 Which term describes the main function of Quality Center?
A. test cases
B. repository
C. load test
D. defects
Answer: B
3 What database can be used with Quality Center 9.2? Select
two.
A. Access
B. Sybase
C. Microsoft SQL Server
D. Paradox
E. Oracle
Answer: C, E

4 What HP functional testing tools integrate with Quality
Center? (Select two.)
A. HP OpenView
B. HP WinRunner
C. HP QuickTest Professional
D. HP LoadRunner
E. HP Change Control Management
Answer: B, C

5 Which component provides an executive-level view of the
entire quality
process?
A. Quality Center Foundation
B. Business Process Insight
C. Service Test Component
D. Quality Center Dashboard
Answer: D
6 When designing test steps it is important to ensure that
all aspects of the
application are tested. When writing test steps, what are
two things that should be done to ensure clear
and accurate steps? (Select two.)
A. specify all actual results
B. use parameters in the step names
C. specify pass and fail conditions for the step
D. use the numbering system for the step names
E. use consistent terminology throughout the test
Answer: C, E

7 Where can you link tests to requirements?

A. from the Test Lab module
B. from the Requirements module
C. on the test details page (Test Plan)
D. on the attachments page (Test Plan)
Answer: B

8 When a called test has parameters, when can you assign
values to the
parameters?
A. values are assigned from within the calling test
B. values must be assigned when the test is executed
C. values are assigned during test design or execution
D. values must be assigned when the test is called, during
test design
Answer: C

9 What are the steps, in the correct order, to convert a
requirement to a test?
A. make changes to the automatic conversion, select an
automatic method
B. select convert to test, select the destination path,
convert to automated test
C. select an automatic method, make changes to the
automatic conversion, select the destination subject path
D. select the destination subject path, select an automatic
method, make changes to the automatic conversion
Answer: C

10 How is a test configured as a template test?
A. The test type chosen must be MANUAL-TEMPLATE
B. The first step in the test must be named template test
C. Right-click on the test name and choose Template Test
D. During test planning, mark the checkbox, under details,
labeled template Test
Answer: C

11 Click the Exhibit button.
What does the icon in the exhibit indicate in the Test Plan
module, under the Test Script tab?
A. there is a test script
B. there is not a test script
C. there is a manual test case
D. the test script has changed
Answer: A
12 While designing the test plan tree, you accidentally
delete a folder that
contained some tests that you need. Can you recover the
tests?
A. no, once a test is deleted, it is gone
B. yes, the tests can be recovered from the Subject folder
C. yes, the test can be recovered from the Unattached folder
D. no, only Project Managers have permission to recover
deleted tests
Answer: C
13 When you define tests inside of Quality Center, it is
important that the tests
are accurate and traceable. What are two other key pointers
when defining tests? Select two.
A. simple
B. consistent
C. repeatable
D. convertible
E. automation
F. appropriate
Answer: B, F
14 What test types can be created in Quality Center? Select
three
A. batch-test
B. vugen-test
C. lr-scenario
D. system-test
E. interface-test
F. wr-automated test
Answer: C, D, F
15 In order to reuse a test across other tests, must the
reused test be a template
test?
A. yes, only template tests are reusable
B. no, the test must be a VAPI test to be reusable
C. yes, template tests are reusable automated tests
D. no, tests do not need to be template tests to be reused
Answer: D
16 What does a live analysis graph illustrate in a visual
overview?
A. all the tests in the Test Plan
B. all the cycles or releases the test is linked to
C. all the requirements linked to the specified test
D. all the tests in a specified folder in the Test Plan
Answer: D
17 How can you create a test plan tree?
A. convert releases to tests
B. define test folders and tests manually
C. save automated tests in Quality Center
D. define test names for each test needed
Answer: B
18 Can you change the values of a called test's parameters?
A. no, values are assigned at run time
B. yes, if the called test is a template test
C. no, you must delete the called test and call it again
D. yes, right-click and choose Called Test Parameters
Answer: D
19 When you generate an Excel report, why is it an
advantage to use
parameters?
A. enables the report to be saved
B. enables the user to name the report
C. enables the report to be used across projects
D. enables the report to be used for different purposes
Answer: D
20 Using the Excel Macro, what type of data can be imported
into Quality
Center? (Select three.)
A. defects data
B. test set data
C. test plan data
D. releases data
E. test Instance data
F. requirements data
Answer: A, C, F
21 Once the Word macro is installed on your computer, what
Quality Center
toolbars will Word display?
A. Test Plan, Requirements and Export
B. Requirements, Defects and Common
C. Test Plan, Requirements and Defects
D. Test Plan, Requirements and Common
Answer: D
22 What graph types are available in each of the Quality
Center modules?
A. age and summary
B. trend and progress
C. summary and progress
D. requirements, coverage and age
Answer: C
23 When a predefined report is saved, what is the file
extension?
A. txt
B. xls
C. html
D. doc
Answer: C
24 Which modules in Quality Center provide predefined graph
templates?
A. Requirements, Test Lab and Defects
B. Releases, Test Plan, Test Lab and Defects
C. Requirements, Test Plan, Test Lab and Defects
D. Releases, Requirements, Test Plan and Defects
Answer: C
25 How is data defined for use in an Excel report?
A. with an SQL query
B. with an XML query
C. with ETL data extraction
D. with a WebDataScraper
Answer: A
26 On the General page of the Excel Report Generator
window, what name is
displayed, by default, in the designer field?
A. the project manager
B. the site administrator
C. the user currently logged in
D. the user who created the report
Answer: D
27 Which menu allows you to generate a predefined report?
A. Help
B. Tools
C. Analysis
D. Favorites
Answer: C
28 What elements can be linked directly to a requirement in
the releases
module?
A. a cycle
B. release tree
C. cycle details
D. a cycle progressa cycle? progress
Answer: A
29 Which module, in Quality Center, starts the testing
process?
A. Defects
B. Releases
C. Dashboard
D. Requirements
Answer: B
30 What details about a cycle can you define in the details
tab? (Select two.)
A. name
B. end date
C. attachments
D. release version
E. linked test sets
Answer: A, B
31 What constitutes a release folder?
A. cycles of the release
B. test plan for the release
C. releases of the application
D. requirements for the release
Answer: C
32 Why do you create a release tree?
A. to define the framework of releases
B. to define the workflow for the project
C. to define the requirements hierarchy
D. to define the test plan for the release
Answer: A
33 How many buttons are available to create a Release Tree?
A. two
B. three
C. four
D. five
Answer: B
34 What types of attachments can be added to a cycle?
(Select three.)
A. snapshot
B. test plans
C. clipboard image
D. release versions
E. system properties
F. linked requirements
Answer: A, C, E
35 Which module allows you to view coverage by cycle?
A. Cycle
B. Releases
C. Test Plan
D. Requirements
Answer: D
36 What is the function of the New Release button?
A. creates a release tree
B. creates a cycle within a release
C. creates a release within a release folder
D. creates a new Release folder in the release tree
Answer: C
37 What is the foundation of the Releases module?
A. the release tree
B. the cycle versions
C. the release cycles
D. the release folders
Answer: A
38 What is an example of an indicator column in the Defect
module?
A. status
B. priority
C. attachments
D. reproducible
Answer: C
39 Where can you find an audit trail of the changes made to
a defect?
A. audit tab in the Defect module
B. status column in the defect grid
C. history tab in the Defect module
D. summary column in the defect grid
Answer: C
40 How can you save a filter that you set in the Defect
module?
A. choose Defects>Save
B. click the Favorites button
C. click the Save Filter button
D. choose Favorites>Add to Favorites
Answer: D
41 When defects are exported out of Quality Center, what
type of file is
created?
A. .xls
B. .doc
C. .mdb
D. .qcd
Answer: A
42 When should you use a private favorite view for defects?
A. need one more
B. use for private sessions of Quality Center
C. use for data on which only you are working
D. use for data on which your group is working
Answer: C
43 When you log a new defect, how is the Detected By field
populated?
A. This field must be filled out as you log the defect
B. This field must be filled out after the defect is logged
C. This field is auto-populated with the user who is
currently logged in
D. This field is auto-populated with the user who executed
the linked test
Answer: C
44 Which button or menu will allow you to view additional
fields in the Defects
Grid?
A. View button
B. Select>View menu
C. Favorites>View menu
D. Select Columns button
Answer: D
45 How many defects can be associated with a requirement?
A. Any requirement can have one defect
B. Any requirement can have multiple defects
C. One for each parent requirement and child requirement
D. A parent requirement can be associated with multiple
defects, but a child requirement can be associated
with one
Answer: B
46 What is tracked when a defect is assigned a status?
A. the defect's priority
B. the defect's severity
C. the defect's lifecycle
D. the users to whom the defect is assigned
Answer: C
47 How many views are available in the Defects module?
A. one
B. two
C. three
D. four
Answer: A
48 What are some examples of entities that a defect can be
associated?
A. Cycle, Release, Test Step, Defect
B. Release, Requirement, Test Set, Test Step
C. Requirement, Test Instance, Test Step, Defect
D. Requirement, Test Step, Test Run, Test Result
Answer: C
49 While running a manual test in the Manual Runner, you
log a defect against
a specific step. Is that defect automatically linked to any
other entities?
A. yes, indirectly linked to the test instance
B. no, a defect can be linked to only one entity
C. no, all links to other entities must be done separately
D. yes, directly to other defects linked to the test
instance
Answer: A
50 From which module or modules can you log a defect?
A. Defect
B. Requirement and Defect
C. Requirement, Test Plan and Defect
D. Requirement, Test Plan, Test Lab and Defect
Answer: D
51 In the Defect module, what is a fixed column?
A. a column with a section list
B. a column with flexible values
C. a column that is non-scrolling
D. a column with a predetermined width
Answer: C
52 When searching for Similar Defects, what field or fields
in each defect are
searched?
A. name and history
B. name and description
C. summary and history
D. summary and description
Answer: D
53 Which statement best describes the requirements
traceability feature?
A. enables definition of a link between multiple
requirements
B. enables definition of a link between a requirement and a
test
C. enables definition of a link between a requirement and a
cycle
D. enables definition of a link between a requirement and a
test set
Answer: A
54 When a requirement is assigned to a release, in which
cycles is it tested?
A. all of the cycles
B. only the first cycle
C. only the last cycle
D. none of the cycles
Answer: A
55 What is the purpose of requirements traceability?
A. to view and establish Test coverage
B. to view cycles that are linked to the requirement
C. to view and establish linkage to other requirements
D. to view and establish what Releases are linked to the
requirements
Answer: C
56 What are some characteristics of a useful Test
Requirement? (Select two.)
A. vague
B. general
C. familiar
D. precise
E. bounded
F. ambiguous
Answer: D, E
57 What does the requirements tree define?
A. hierarchical relationships between requirements
B. the number of test plans needed for each requirement
C. identify defects that are associated with each
requirement
D. which releases and/or cycles are linked to each
requirement
Answer: A
58 What feature does Quality Center use to calculate the
testing level for each
requirement? (Select two.)
A. risk analysis
B. impact analysis
C. requirement type
D. failure probability
E. resource availability
Answer: C, E
59 What are two steps in risk-based testing? (Select two.)
A. perform risk analysis
B. establish testing time
C. perform impact analysis
D. establish failure probability
E. establish development time
F. establish the number of testers needed
Answer: A, D
60 If a child requirement is linked to a test, what else is
automatically linked to
the test?
A. the Release Cycle
B. the Parent Requirement
C. the Functional Requirement
D. the other child requirements
Answer: B
61 What does the Direct Cover Status of a requirement
indicate?
A. the type of parent requirement
B. the execution status of linked tests
C. the component of the application covered
D. whether the requirement has any linked defects
Answer: B
62 What can you do under the RichContent tab in the
Requirements module?
A. add, view and edit RTF content
B. add, view and edit MS Word content
C. add, view and edit MS Excel content
D. add, view and edit MS Access content
E. add, view and edit SQL statement content
Answer: B
63 What is the Coverage Analysis View used for in the
Requirements module?
A. to identify which test sets are associated with the
requirement
B. to identify and analyze the tests that are associated
with the requirement
www.ExamWorx.com
- 19 -
C. to identify which releases and cycles are associated
with the requirement
D. to identify and analyze which defects are associated
with the requirement
Answer: B
64 What are some examples of the default Quality Center
requirement types?
(Select three.)
A. Child
B. Cycle
C. Parent
D. Testing
E. Business
F. Functional
Answer: D, E, F
65 What testing levels does Quality Center define for risk-
based testing?
(Select two.)
A. ALL
B. BASIC
C. NONE
D. UPPER
E. GROUP
F. FUNCTIONAL
Answer: B, C
66 What additional Quality Center modules may you have
access to if
installed and/or licensed? Select all that apply.
A. reports
B. releases
C. dashboard
D. documents
E. business components
Answer: C, E


67 What link do you click on to log on to Quality Center
9.2?
A. Add-Ins Page
B. Quality Center
C. Site Administrator
D. Authenticate User
Answer: B

68 What tools does Quality Center provide for performing
test data analysis?
(Select two.)
A. linking
B. graphs
C. reports
D. tracking
E. traceability
Answer: B, C

69 What can be accomplished using the Tools Menu of the
Common Toolbar?
(Select two.)
A. define a cycle
B. log a new defect
C. switch to another project
D. open the Documentation Library
E. display the Quality Center version
Answer: B, C

70 Quality Center 9.2 provides what type of repository for
all testing assets?
A. database
B. file system
C. web-based
D. open access
Answer: C

71 Where is the common toolbar located?
A. lower-left part of the window
B. upper-left part of the window
C. upper-right part of the window
D. lower-right part of the window
Answer: C

72 Which toolbar contains buttons for frequently used
commands in the
current Quality Center module?
A. Module Toolbar
B. Standard Toolbar
C. Common Toolbar
D. Formatting Toolbar
Answer: A

73 How do you make a context-specific shortcut menu appear?
A. right click on an interface element
B. double click on the interface element
C. choose Shortcut from the Help menu
D. choose Context Menu from the View menu
Answer: A

74 What HP testing tools does Quality Center integrate
with? (Select two.)
A. WinRunner
B. Open View
C. Visual API-XP
D. Performance Center
E. Change Control Management
Answer: A, C

75 How many core modules are in Quality Center 9.2?
A. three
B. four
C. five
D. six
Answer: C

76 In the Execution Flow tab of the Test Lab module, what
does a solid blue
line between two tests indicate?
A. the previous test must pass
B. the previous test must finish
C. the test has undefined parameters
D. the second test is called from within the first
Answer: B

77 When defining execution conditions in a test set, what
completion status
choice or choices available?
A. finish
B. if/then
C. pass and fail
D. pass and finish
Answer: D

78 What must the goal of a test set meet?
A. the goal of the test plan
B. the description of the test set
C. the description of the requirement
D. the goal of the associated cycle or cycles
Answer: D

79 Can a test set include both manual and automated tests?
A. No, a test set must be all manual tests
B. No, a test set must be all automated tests
C. Yes, however an automated test can not follow a manual
test
D. Yes, automated and manual tests may be used in the same
test set
Answer: D

80 When developing a test plan, what should the tester be
careful about and
plan for between tests?
A. execution time
B. execution control
C. automation timing
D. data dependencies
Answer: D

81 How do you run an automated test concurrently on
multiple remote hosts in
a test set?
A. run the test locally
B. select a host group for the local machine
C. select multiple hosts for the automated test
D. add multiple instances of the test to the test set
Answer: D

82 Quality Center provides the framework for test
execution. What are the
stages of this framework?
A. import requirements, import tests, run the tests
B. link the tests to cycles, run the tests, log defects
C. develop the test set tree, organize test sets, set test-
set properties, run the tests
D. convert the test plans to test sets, set the hosts for
automated scripts, run the tests

Answer: C

83 What are two elements of the Test Lab module? (Select
two.)
A. Linked Cycles
B. Linked Defects
C. Execution Flow
D. Execution Results
E. Graph of Selected
F. Linked Requirements
Answer: B, C

84 What types of tests make up a test set?
A. smoke and integration
B. smoke and automated
C. integration and manual
D. manual and automated
Answer: D

85 In executing a test, what do you link to a test set?
A. a cycle
B. a defect
C. an LOB
D. a release
Answer: A

86 At what level is a main test set tree folder?
A. root
B. main
C. subject
D. unattached
Answer: A

87 When a test set folder is linked to a cycle, are all of
the test sets in the folder
linked to that cycle?
A. No, only a test set can be linked to a cycle
B. No, a test set folder can only be linked to a release
C. Yes, all of the test sets in the folder will be linked
to that cycle
D. Yes, all of the test sets in the folder will be linked
to the cycle and all other cycles in that release
Answer: C
88 What is a test set?
A. a folder of test results
B. a folder of testing cycles
C. a group of tests to achieve a goal
D. a group of tests assigned to a release
Answer: C

89 What choices are available in Test Set Properties if any
test fails?
A. Rerun the test up to 5 times
B. Run the next Test Set, Do Nothing
C. Run cleanup test before each rerun of the test
D. Do Nothing, Stop the Test Run, Rerun the Test Set
Answer: D

90 While defining a test set, you want to notify your
Project Manager if the
permission levels on the testing box are inadequate. What
is the best way to accomplish this?
A. select inadequate in the permissions field
B. ensure that the correct alert rule is in effect
C. check the appropriate checkbox in Test Set
Properties>Notifications
D. email test results to the Project Manager at the
completion of the test set

Answer: C

Is This Answer Correct ?    5 Yes 2 No

Post New Answer

More Automation Testing AllOther Interview Questions

How to explain testing life cycle where exactly testing starts after coding stage or after preparing FRS document

5 Answers  


What you know about table-driven testing?

0 Answers  


WHAT IS TEST SCRIPT AND HOW DO YOU CREATE IT?

0 Answers  


Can we find all links on a web page?

0 Answers  


What are the frameworks available in rc?

0 Answers  






what's main work for software tester pls u give answer step by step. starting to till ending.

1 Answers  


is there any Rational Functional Tester certification questions available?

1 Answers   Infosys,


Do you know what is robot api?

0 Answers  


Tell us what is the difference between @factory and @dataprovider annotation?

0 Answers  


In Selenium how a test suit is run and report is generated.

0 Answers  


what are the steps followed in unit testing, system testing, integration testing

0 Answers  


Hi all, Do anyone have the experience in PDF Document Automation using OLE objects and methods? If so suggest the best websites for source. Thanks :-)

0 Answers  


Categories