From Quality Center, how can we take a back up of a project??



From Quality Center, how can we take a back up of a project??..

Answer / a sameer

Usually the QC back up process involves the following two
entities.

1. QC Project Repository found on the QC Server. The path to
the project repository can be found on Site admin, Site
projects,Selct the project and you can find the path on the
Project Directory entry on the right side of the screen. The
file system on your QC server should have a back up
procedure in place, if not which I doubt, you may need to
talk to the admin and put in place.

2. QC Project Database, part of your database on the
database server. Your DBA can let you know the general back
up procedure followed in your org.

Hope this will solve your problem. :)

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

diffrence between banking domain and medical domain

2 Answers   FlashTECH,


What is mean by Defect Injection?,Tell me in brife

4 Answers   Wipro, Zensar,


what are test cases for edit,add,delete,save,preview and main buttons and test scenarios

2 Answers   L&T, Wipro,


who you done security testing in Banking project? tell me situation where you perform?

0 Answers  


What is Matrix in testing?

1 Answers   Tech Mahindra,






can anyone tell me process of how the bugs r reported by testers??n after reporting bugs is the work of test engineer finished or still he has to do any thing????

1 Answers  


Which is the cost effective model between V Model and Waterfall model and V model and Spiral model

1 Answers  


How Defect prevention can be accomplished ?

2 Answers   Crea,


Who is responsible for doing "Cause-Effect GraphCause Effect Graph". If tester is responsible then how we to do it? Urgent

0 Answers  


What is test design???

5 Answers   HCL, IBM,


Can anyone explain me these 3 techniques with an example? 1).Equalent Class Partision 2).Cause-Effect Graph analysis 3).Error Guessing.

3 Answers  


Being an Manual tester, what will be the role or activity in test plan ?

0 Answers  


Categories