For every phase of SDLC we face entry and exit criteria.
For example, if i want to start testing phase, the entry
criteria for this is code is completely ready for testing.
The exit criteria for testing phase is...the coverage of
functionality /testing is completely done on software.
So here what i mean for entry criteria is the end of one
phase will be entry criteria for next phase, and exit
criteria will be the end of the respective phase with
respective checklists that checks everything is covered.
| Is This Answer Correct ? | 5 Yes | 0 No |
what is the difference between bug log and defect report?
what is security testing? can u please set an example for it?
How can We stop Client side Validation and do Server side validation ? Is there any option on IE
Is Validation Test & Negative Tests have same meaning???Are both same???
Difference b/w bug and defect ?
What is actually a rule based testing
what is Fault based testing?
Generally Where do we concentrate more while doing Web Application Testing means which functional area...Thanks in advance...
From which phase will you start testing and How will you find out the left out things in testing?
I have 2 questions: 1) What are Technical test cases 2) What are Business test case (Or Business driven test cases)
Usecases and nounlists are associated with the following Requirement analysis methodologies 1.Information engineering 2.Object oriented analysis 3.Structural analysis 4.Functional analysis.
Generally which software development model is used in project based companies?