In the Capability Maturity Model, at which level is
effective measurement mastered?
1. Level 1
2. Level 2
3. Level 3
4. Level 4
5. Level 5
Answers were Sorted based on User's Feedback
Answer / deepshikha
Effective Measurement is monitored at all levels. After the
achievement of first level, effective measurement is
monitored for the next level.
| Is This Answer Correct ? | 2 Yes | 1 No |
Demonstrated system testing experience in a large on-line environment – with at least 2 years experience including Development of test strategies development of test plans • execution of tests according to plans • defect management • using industry tools (eg HP Quality Centre formerly 'Mercury Quality Centre' (Test Director) , and • experience in interrogating and querying SQL server and Mainframe dtabases using tools such as RC Update, BRIO, SQL Server Management Studio
What is the testing process you follow in your organization?
Explain ad hoc testing?
What are the ways of functional testing? Can you give me an example of how to perform Functional testing on a Login Page for example.
what is the role of external testing companies?
The purpose of which is to allow specific tests to be carried out on a system or network that resembles as closely as possible the environment where the item under test will be used upon release?
What is compliance testing ?
When is a test considered to be successful?
What are the main bugs which were identified by you and in that how many are considered as real bugs?
What all can be included in white box testing?
What are the types of defects?