Answer / shailesh
Resumption Criteria -
If testing is suspended, resumption will only occur when
the problem's that caused the suspension has been resolved.
When a critical defect is the cause of the suspension,
the “FIX” must be verified by the test department before
testing is resumed.
Assumption Criteria -
Certain things is project is changed very frequently so you
have to assume many things. That all should mentioned in
this section.
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / sindhu
The following assumptions were used to develop this test
plan, and the test schedule:
• Requirements and Functional Specification are complete,
current, and stable.
• Development will run a verification test for each drop,
including unit tests of the changed code and integration
tests of any builds for supplemental utilities that they build.
• Onyx is assumed friendly, reliable, and responsive,
without major functional flaws.
| Is This Answer Correct ? | 0 Yes | 2 No |
What does the scope contain in a test plan
what is validation and verification of a bug?
hi all, I am doing Testing course,can anyone help me what is domain & module?
Can anybody send me sample test case for GUI testing for a web page? for eg Homepage
What is the Myers Boundary Table?
Which appraisal method class is the best?
write test strategy for hotmail login screen
What is rapid application development model (rad)?
what is test design techniques ?
what is system testing? explain with an example.
what is the use of this application?
Please give me example of - 1. High Severity and High priority Bug ? 2. High Severity and low priority Bug ? 3. High priority and low severity Bug ? 4. Low Severity and low priority Bug ? Thanks