What is Entry and Exit Criteria in Testing Process?
Answers were Sorted based on User's Feedback
Answer / ks thangavel
ENTRY CRITERIA
1 SRS
2 FRS
3 USECASE
4 TEST CASE
5 TEST PLAN
EXIT CRITERIA
1 TEST SUMMARY REPORT
2 METRICS COLLECTION
3 DEFECT REPORT
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / swathi
Entrance and exit criteria comes under the Testing life
cycle.Entrance criteria is, to know when to enter in to the
testing cycle and exit criteria is when to stop/come out of
that testing cycle.Exiting of one cycle can be the Entrance
of another testing.
| Is This Answer Correct ? | 4 Yes | 3 No |
Answer / malli
ENTRY CONDITION:
compleate &corrrectness of test cases
create test case environment
receive stable build from development side
EXIT CONDITION:
ALL THE MDULE TO BE TESTED
ALL MAJOR BUGS ARE RESOLVED
| Is This Answer Correct ? | 1 Yes | 1 No |
waht is deffect?
what is regression testing???
How do u prepare test environment for ur application?
what is the use of testing? is testing compulsary
Hi All, Need a little help in understanding cookie testing. Can any1 please tell me were are the cookies stored in win xp, vista, 7? Is the location same for both 32 bit and 64 bit machine? All all cookie data encrypted? If no, which type of cookie data are encrypted and why? Need this as soon as possible. Thanking you all in advance.
HI friends, I am 1.2 years of exp in manual testing,,, now i got job in Visteon,,, as a tester in embedded products,,, but they told it is contract of only 3 months,,, can i take this offer or not plz give idea,,,,, if i take mean it there any possibility to be a regular employe of that company after 3months..... reply soon
Puzzle:A rope, a match box are given.the rope takes 1 hr to burn off completely.the rope is not uniform.there is no watch with u.how can u calculate half an hour of time?
when will go for compatibility testing and when you use the testing metrics?
what is the difference between developer testing and tester testing?
How do you find synchronisation problems normally?
After loging the bugs in bugzilla the developer fix the bugs and change the stautus to fixed then the tester verfiy the bug/functionality in application. The verification is going to happen with present version or comming/new version?
what is walkthrough?