which certification we have to complete first?
ISTQB or CSTE? in ISTQB which level i have to choose?
Foundation level or advanced level?
Can any one tell what will be the syllabus and how tough it
will be? pls anyone share the experience

Answers were Sorted based on User's Feedback



which certification we have to complete first? ISTQB or CSTE? in ISTQB which level i have to choose..

Answer / ameet

In today's world, where competition is a fact of life and
the need for a work force knowledgeable in principles and
practices is a central concern for many companies, ISTQB
certification is a mark of excellence. The International
Software Testing Qualification Board (ISTQB) is an
internationally recognized certification body.

Both ISTQB and CSTE are different certification bodies.
However being a Tester and if you are starting your career
in Testing with less than 2 yrs experiance then the best
way to go about is to appear for ISTQB foundation exam.
ISTQB advance level is next stage to ISTQB foundation level.
which has 3 types of sublevels 1) Technical Tester, 2)
Functional Tester & 3)Test Manager

I have certified with CSTE and have 5+ yrs of exp. CSTE is
also very recognized as ISTQB.. but it involves more time
and effort for the exam.

Difference between the 2:
ISTQB Foundation :The Foundation Level exam consists of
approximately 40 multiple choice questions of 1 points
each. An exam amounts to 40 points total, of which 65%(26
points) must be attained in order to pass. The exam is a
closed book exam. You have 75 minutes to finish.
ISTQB Certified Tester is the first truly international
certification examination. This examination/certification
comes from International Software Testing Qualifications
Board (http://www.istqb.org)

For CSTE:
Pls. Visit http://www.softwarecertifications.org/ for up-to-
date information about the Exam
Exam Pattern:

• Exam has four sections and total exam duration is
270 min.
• There are 2 section having objective and 2 sections
having subjective paper.
• Objective paper has 50 questions and time limit is
45 min. You may be asked to match the pairs also.
• Subjective paper may have 6 to 10 questions and
time limit is 75 min.
• 10 min, break after each paper. Total duration is
(45 X 2 + 75 X 2 + 10 X 3 = 270 min)
• Passing = 75% >.
• You have to write the exam using HB pencil only.

I hope this helps. Wish you all the best. You may decide
accordingly.

Is This Answer Correct ?    20 Yes 0 No

which certification we have to complete first? ISTQB or CSTE? in ISTQB which level i have to choose..

Answer / sneha

Hi....if u have 2 yrs of exp in testing then u can go for
CSTE,if u have no exp or less than 2 then u can go for
ISTQB.And in ISTQB u have to complete foundation level
first with out foundation level ur not eligible for
advanced level......and syllabus u can download from the
corresponding sites and ISTQB is not at all tough....u can
do it....ALL THE BEST

Is This Answer Correct ?    16 Yes 1 No

which certification we have to complete first? ISTQB or CSTE? in ISTQB which level i have to choose..

Answer / dsnithi

Hi sneha i have 2.7 yrs of exp in testing. so i think i can
attend that CSTE is it? but one of my friend is telling
that i should do ISTQb first so wat to do

Is This Answer Correct ?    2 Yes 0 No

which certification we have to complete first? ISTQB or CSTE? in ISTQB which level i have to choose..

Answer / sneha

U can write CSTE directly there is no rule tht first u have
to complete ISTQB and then only CSTE...both differ from each
other.Since u have 2.7 yrs of exp u can write the
CSTE.....ALL THE BEST

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

Hi Friends Can Any one give test cases on Credit card system

1 Answers  


is that software tester may or may not be involved in the actual acceptance testing

2 Answers  


who is best faculty for testing tools?

4 Answers   TCS,


Hi ALl, Can you please list out Q & A for Test Lead,which Interviewer may ask in interview for Test Lead position

0 Answers  


What is a Scenario Matrix's document?

1 Answers  






Tell me about any quality efforts you have overseen or implemented. Describe some of the challenges you faced and how you overcame them.

1 Answers   CTS,


wat is build verification testing

21 Answers   Tech Mahindra,


What is the need for testing?What is the Outcome of Testing? What is the Purpose of Testing? When to start and Stop Testing?

2 Answers   HCL,


What’s the role of documentation in manual testing?

1 Answers  


what is localization testing?is it a black box testing or white box testing?describe briefly?

8 Answers  


i have doubt suppose iam purly working in manual, when i will work on sql and performence testing? pls any one clarify doubt?

3 Answers  


What is contained in CRS,SRS and FS ?

6 Answers   Systel,


Categories