How to switch between two projects?
Answers were Sorted based on User's Feedback
Answer / amita
Take there are 2 projects P1 and P2.
You are already login into project P1, then see in the
right hand side of the application, there is option called
TOOLS, click on that and u will get a option CHANGE
PROJECT, click on that and then click on select, u can move
to the project P2 this way.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / changeproject
This will be correct but then how do i get this option
under the tools menu? where do i make changes in order to
get this enabled. Currently I have qc and we have two
projects but every time i have to switch between them i
need to log out and do it. This is getting tedious so.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / yasobant badatya
Guys,
Amita's answer is absolutely correct.
If you have multiple projects under the same domain in QC
and based on the user authorization, you can able to view
the projects while you toggle between the Tools (link
available on the right side of the QC)
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ganga
Hi,
The 2 answers are correct.But,in some machines the change
project option is not available in Tools menu.
| Is This Answer Correct ? | 0 Yes | 0 No |
Hi I am new in testing, Could you pls assist in How to link Quality center with QTP . Pls provide detailed step for connectivity . Thanks Gaurav
I am using Quality Center 9.2. While raising a defect i can see that there is only option to send a mail to assigned and it is also sent to me. Is there any way i can send the mail to multiple users ? I know i can save the defect and than later sent it to multiple users, but is there any way where i can send it at the time of raising the defect itself. Any configuration that can be done by an adminstrator?
where are test cases stored in Test director?
how do we find that there are duplicate bugs in Test Director or quality center?
What is Business Process?
Can we upload test cases from an excel sheet into test director?
How many Reports Can be Got from Test Director?
Can we map the defects directly to the requirements (not thru the test cases) in the test director?
Can we also write test cases in test director instead of excel or word if yes, how?
How do I run reports from test director?
In the defect life cycle, if you find a defect in QC and think that it is not a valid defect. what will you do? just close it or store it in any document for future review, if yes what type of document and where?
Explain the procedure of connecting testdirector in qtp?