2)The prototype model is chosen on what grounds?
A)During information engineering phase when all the
requirements are clear and there is no space for any confusion.
B)When the requirements are well understood and there is a
need for developers to create a fully functional system
within a very short time period.
C)During information engineering phase when only generalized
objectives of the software are defined and it is not
possible to define detailed inputs, business rules and
output requirements.
D)when the focus should be given on the delivery of an
operational product with each increment, where each
increment is a spiral model.
Answers were Sorted based on User's Feedback
What is the exact difference between smoke testing and sanity testing.?
Tell me the advantage and disadvantage of cookies?
what is meant by alpha testing?
wat is ur involvement in user acceptance testing
Testing Methodologies
types of reviews?Advantages of reviews? Diff between process and procedure? diff b/w verification and validation? diff b/w cmm,cmmi? exp tqm,gqm,iso,ieee? Roles and responsibilities of tester? Ricks,types of ricks? what r Quality factors?
In an organisation practically how we can implement the Compatability testing(web based applications and windows based applications)
What is bug life cycle?Explane with example
7)In a Banking Application, for a module to pay a bill it must have 3 screens (Entry, verification and confirmation screens) in series. It was found that at the final confirmation page the data was getting saved in the database but was not getting displayed on the screen. Which is the best suited category and severity of this defect? A)High severity Content issue B)Low severity Content issue C)High severity Data Loss D)Medium severity data loss
explain statement coverage?
What's the difference between alpha and beta testing?
what is function testing?