Answer / jyothi

While doing paint of Aero Palin we can generate the Test
cases Like
1. what is the Client required Color
2. Is the color already indicated to other Companies Flight.
3. is the color should indicating the origin country
4. is the paint providing look and feel.
5. is the paint will be quality one means after using for a
long time also is it look as same atleast similar.
6. the life time of paint.

Is This Answer Correct ?    6 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

What is the difference between a Test Plan and a Test Strategy?

6 Answers   Symphony,


What is PLC testing? since there are job openings in this area Please let me know what it mean and some more related information.

2 Answers  


What is dry run testing??

2 Answers  


Where will you give the Reproduce option in Bug report?

2 Answers   GE,


what are the advantages of waterfall model over V-model??

5 Answers  






exact definition of defect tracking?

1 Answers  


What is testing life Cycle and Explain different phases?

3 Answers   Covansys,


what is peer test?

2 Answers   Semantic Space, SoftProdigy,


1. fault based testing is reversed of which testing? option.1 conventional software testing Option 2Operations and classes that are critical or suspect Option 3 Use-case validation Option 4White-box testing of operator algorithms 2. Testing OO class operations is made more difficult by Option 1 Encapsulation Option 2 Inheritance Option 3 Polymorphism Option 4 Both Inheritance and Polymorphism 3. Which of these techniques is not useful for partition testing at the class level Option 1 attribute-based partitioning Option 2 category-based partitioning Option 3 equivalence class partitioning Option 4 state-based partitioning 4.Client/server architectures cannot be properly tested because network load is highly variable. Option 1 true Option 2 false 5. Real-time applications add a new and potentially difficult element to the testing mix Option 1 performance Option 2 reliability Option 3 security Option 4 time 6.Which one is not key term used in internal control and security Option 1 Threat Option 2 Risk Control Option 3 Vulnerability Option 4 Exposure 7.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products. Option 1 true Option 2 false 8.Static testing requires...? Option 1 Binaries Option 2 Source code Option 3 Product Option 4 Executables 9.etesting is testing the application with multiple sets of data is called retesting Option 1 true Option 2 false

2 Answers   Infosys,


Multiple class testing is too complex to be tested using random test cases. is it

1 Answers   3i Infotech,


wat s security testng,wat u do in this testng

2 Answers   Hewitt,


if tester found some bugs in the application then which format they will send it to development team.

4 Answers   HCL,


Categories