5 negative test case for lift....
Answers were Sorted based on User's Feedback
1) Enter more than the specified person
2) smoke or lit fire inside the lift
3) try opening door while moving.
4) press stop before the destination.
5) press opposite button from the source eg. if on ground
floor press down button and vice versa
Byee
Kishore
Is This Answer Correct ? | 52 Yes | 2 No |
Answer / abhishek pradhan
I dint think the 2nd and 3rd test will fall under -ve test
category...?
Is This Answer Correct ? | 17 Yes | 3 No |
Answer / rohit lamsonge
1. Cross the limit of lift and check functionality.
2. Check (press close door button) the door automation when some is standing in middle.
3. Check response speed of door after pressing close button. (The door should close slowly)
4.when lift is travelling in upper direction. Press reverse direction button.
5.when lift is travelling in upper direction. someone call in middle for reverse direction.
6.Press open door button in middle when lift is travelling.
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / maria
1. Check the total weight exceeds the total weight it
specifies, Check whether the error signals or sent properly
or not
2.Check for whether the lifts stops in correct floor when
pressed the perticular number
3.Check whether (if the lift doors are automatic) the doors
are opened properly only when lift is not running
4. Check for the indicator representing the floor number
are displayed properly and is matched
5. Check the behaviour of the lift when pressed some
irregular ( like pressing open the door) button when lift
is moving
6. Check for what should be the behaviour of the lift in
case of emergency,
Please let me knw whether the above said cases are correct
or not.
Is This Answer Correct ? | 24 Yes | 24 No |
Answer / karunakar reddy
2,3,4 and 6 are in Positive Approach.We Can Prepare Thease
in Negative approach Also
2.Check for whether the lift will not be stopped in Expected
Floor when
pressed the Wrong number.
3.Check whether (if the lift doors are automatic) the doors
are opened properly only when lift is not running.
4. Check for the indicator Not representing the Another
floor number When We r in Specified Floor.
6. Check for Whether it is not Behaving Normally in
Emergancy time.
Is This Answer Correct ? | 7 Yes | 7 No |
wht is test data,test condition
Can you explain decision tables?
does regression testing start from 2nd build or 1st build?why?could u plz answer
What is meant by Entry and Exit points in Testing? Raam - ramumcato@yahoo.com
what are test beds
Can anybody give the syllabus of Manual testing in order wise so i would like to prepare for that in proper manner. I have only one month time to get prepare for that. Rashmi_vastred@yahoo.co.in
How does one do Regression Testing for Manual Testing projects?
pleez mail me testcase examples for web application..at mina_ims@yahoo.com
Training for Manual/QTP Testing from 6 years MNC experience engineer, working in Patni with Project .Guranteed Job training else fee back in Mumbai-mail-- >amol.dhumalatrediffmail dot com
Define Deployment and User Acceptance.
what is the difference between Bug and Defect
What is a "Good Tester"?