Which is not present in formal review?
a.)Facilitator
b.)Auditor
c.)Author
d.)Recorder
Answers were Sorted based on User's Feedback
Answer / priya
answer:Auditor
Facilitator is the Proj manager
Author is the tester
Recorder is the person who keep track of all the matters
discussed in the meeting
Is This Answer Correct ? | 11 Yes | 1 No |
Answer / farah
correctly said, "Facilitator is the Project manager" who
facilitates the project
Auditor (Testing auditor) check whether or not all the
things are going the way it should be in testing. Check
Organizational standards etc.
Without auditor formal review is not possible.
Facilitator may or may not be the part of formal review.
Is This Answer Correct ? | 5 Yes | 0 No |
Tell me abuot your daily activities as a test engineer.
What is Verification and Validation ?
Explain about Bug life cycle?
what we do when our reported defect reject?
When a high severity issue is found in production how to handle this situation.
what are reviews in sdlc?
Test cases for Equity,Bond,Futures and options financial instruments
what is defect clustering and pesticide paradox?
6 Answers IGT, Optimus, SOS, Verifone,
What is the goal of Software Configuration Management(SCM? a.)Configuration Identifier b.)Configuration Control c.)Process Management d.)All options.
What is split testing?
What are the possible Test cases for Save in M.S word ?
What is defect pooling?