what r the key components in a test plan document?
Answers were Sorted based on User's Feedback
Answer / saikrishna reddy.k
following are thekey components in test plan
1.introduction
2.scope&objective
3.testplan id
4.list of features
4.1features to tested
4.2features not to tested
5.test approach
6.test environment
7.entry criteria
8.suspention criteria
9.exit criteria
10.test deliverables
11.staffing needs
12.roles and resposibilities
13.training needs
14.communication & status reporting
15.schudule
16.approvals
if any thing is more pls give me feed back.
thank you.
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / suneel reddy
key components are
The extent to which
features tobe tested
features not to be tested
Feature pass/fail
test envirornment
testing approach
suspension criteria
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / surya
14.communication & status reporting
will not come under Test Plan as per IEEE 829 standard.
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / prajakta
Along with above some others are there
1) Risk
2) Test Schedule
3)Control Procesure like bug Review meeting, change request,
defect reporting.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / prajakta
Along with above some others are there
1) Risk
2) Test Schedule
3)Control Procesure like bug Review meeting, change request,
defect reporting.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chandru
In addition to the above components the factors like:
1.Unforeseen problems that means we have to guess certain
problems that may arise in client's place.
2.Scheduling and allocation the testing resources
3. HW/SW requirement.
4.In additon to Risks, failures to be identified like HDD
crash, DB recovery, back ups needed in terms of HW/SW and
resources to be planned in advance!
Is This Answer Correct ? | 0 Yes | 0 No |
what is cyclomatic complexity ?
what is meant by negative testing..give me one example?
17 Answers MBT, TCS,
What is Mutation Testing? Is it white box or black box testing. This is what I think about mutation testing..It is the testing done after the code has been modified in an application( after geting defect complain from clients)with the same test cases and same old test data... Please correct me If I am wrong...............
What is QMS,PMS,BMS
is possible smart identification through descriptive Programing
What is difference between Object Repository and Shared Repository?
I’m looking for test management software with collaboration capabilities but at an affordable rate.
I’ve heard that Zephyr, a test management tool saves the trouble of sending weekly and monthly status reports. Is that true?
Hello Can anyone please share the interview details for QA positions in Tribal Fusion, Noida. Much Thanks
What is the responsibility of programmers vs QA?
What is the difference between black box and white box testing?
How to estimate testing effort ?