Answer / saikrishna reddy.k

following are thekey components in test plan
1.introduction
2.scope&objective
3.testplan id
4.list of features
4.1features to tested
4.2features not to tested
5.test approach
6.test environment
7.entry criteria
8.suspention criteria
9.exit criteria
10.test deliverables
11.staffing needs
12.roles and resposibilities
13.training needs
14.communication & status reporting
15.schudule
16.approvals
if any thing is more pls give me feed back.
thank you.

Is This Answer Correct ?    5 Yes 0 No

what r the key components in a test plan document?..

Answer / suneel reddy

key components are

The extent to which

features tobe tested

features not to be tested

Feature pass/fail
test envirornment
testing approach
suspension criteria

Is This Answer Correct ?    1 Yes 0 No

what r the key components in a test plan document?..

Answer / surya

14.communication & status reporting
will not come under Test Plan as per IEEE 829 standard.

Is This Answer Correct ?    2 Yes 1 No

what r the key components in a test plan document?..

Answer / prajakta

Along with above some others are there
1) Risk
2) Test Schedule
3)Control Procesure like bug Review meeting, change request,
defect reporting.

Is This Answer Correct ?    0 Yes 0 No

what r the key components in a test plan document?..

Answer / prajakta

Along with above some others are there
1) Risk
2) Test Schedule
3)Control Procesure like bug Review meeting, change request,
defect reporting.

Is This Answer Correct ?    0 Yes 0 No

what r the key components in a test plan document?..

Answer / chandru

In addition to the above components the factors like:

1.Unforeseen problems that means we have to guess certain
problems that may arise in client's place.
2.Scheduling and allocation the testing resources
3. HW/SW requirement.
4.In additon to Risks, failures to be identified like HDD
crash, DB recovery, back ups needed in terms of HW/SW and
resources to be planned in advance!

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More QA Concepts Interview Questions

what is cyclomatic complexity ?

3 Answers  


what is meant by negative testing..give me one example?

17 Answers   MBT, TCS,


What is Mutation Testing? Is it white box or black box testing. This is what I think about mutation testing..It is the testing done after the code has been modified in an application( after geting defect complain from clients)with the same test cases and same old test data... Please correct me If I am wrong...............

2 Answers  


What is QMS,PMS,BMS

5 Answers   QA,


is possible smart identification through descriptive Programing

0 Answers  






What is difference between Object Repository and Shared Repository?

1 Answers  


I’m looking for test management software with collaboration capabilities but at an affordable rate.

1 Answers  


I’ve heard that Zephyr, a test management tool saves the trouble of sending weekly and monthly status reports. Is that true?

2 Answers  


Hello Can anyone please share the interview details for QA positions in Tribal Fusion, Noida. Much Thanks

0 Answers  


What is the responsibility of programmers vs QA?

4 Answers   TCS,


What is the difference between black box and white box testing?

0 Answers  


How to estimate testing effort ?

0 Answers  


Categories