work break down structure in manual testing
Answers were Sorted based on User's Feedback
Answer / penisetty
WorkBreak Structure: - (WBS) DEFINITION: In terms of
software project management, this is an exhaustive,
hierarchical (from general to specific) tree structure of
deliverables and tasks that need to be performed to
complete a project.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / latha
Hi,
Criteria of complete work-breakdown-structure decomposition
for a test subproject
Decompose the test project into phases.
Decompose each phase into constituent activities.
Decompose each activity into tasks and subtasks until each
task or subtask at the lowest level of composition
satisfies the criteria below.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sunil
if anyone know answer plz mail me
sunilspl_msc@yahoo.com
Is This Answer Correct ? | 0 Yes | 0 No |
How does testing affect risk?
1.. what is mean by data base testing and what are the important things you want to check while in database testing ?
What is the difference between Performance testing and Load testing ?
Hi, Please can one tell me how to test the usability testing, which method has to be used, how to write the report? Thanks Deepa
What is a testbed in manual testing?
How we map test cases with the requirement in Quality Center plzzz give the procedure step by step
Give me examples for high priority and hign severity defects?
why is it necessary to give a priority to the test cases or/and requirements. why does the Test case ID is not sufficient to identify the test cases to be executed first.
When we use Boundary Value Analysis and Equivalence Partion? Which one is best?I heard that ANy one of this technique useing by a comany...is it right?
What is a TEST CONDITION?When it is used?who prepares tesst conditions? Also pls explain me clearly with an example.Plsss reply me fast. Thanks for the repliers.
How can a testengineer coordinate with developer in fixing bugs?
What problem you have right now or in the past? How you solved it?