describe Bug life Cycle and the process taken in your organization...

Answer / murali.msc03

As soon as Test Engineer finds a Bug will Raise the bug as
in NEW Status and will post it development Tl and Will keep
it in Open Status and assign it to concerned developer. and
he can change the status of bug as duplicate, As designed,
not Reproducable, if it is a bug then developer will work
on it and give it as Fix status. Then Tester will retest
that bug and see that it is reproducable or not if it is
not reproducable then he will close the bug, if its
reproduce the same bug then keeps it in reopen status.

Is This Answer Correct ?    2 Yes 0 No

describe Bug life Cycle and the process taken in your organization...

Answer / sreenivas

In my organization bug life cycle starts with a defect I
found and will shoot a mail to development lead keeping a
status as NEW, then development lead is going to assign it
to the developer as status OPENED (if it is really a bug),
then developer is going to fix that bug and shoot a mail to
directly to me(test engineer) saying it is FIXED. I will
retest(FIX VERIFY) that bug and shoot a mail to the test
lead if it is FIXED and finally test lead will change a
status of the bug to CLOSED by shooting a mail.

Is This Answer Correct ?    1 Yes 0 No

describe Bug life Cycle and the process taken in your organization...

Answer / ramireddy

when we found a defect set the status as New and set the
severity bug revied by the in our seniour people based on
the severity they will set the priority and then they will
assign to the corresponding developer based on the priority
developer fix it,and then assign to corresponding tester
and again r-tested he will fix correctly close the bug,if
it is reproducible then re-assign to the corresponding
developer.

Is This Answer Correct ?    0 Yes 0 No

describe Bug life Cycle and the process taken in your organization...

Answer / sra1

as soon as tester receive the build or software the tester
test the application and execute the test case.if the
tester found the bug in the testing he l"l termed as "new".
the pm analyse the defect & he l'l give to the developer.
the developer l"l "open" it now the developer is rectifying
the bug.and after solving he l"l "fixed" he bug.then the
regression testing is oocured whether the bug is fixed or
not if fixed then the tester l"l "closed" it.if the bug is
not rectified then then the tester reports a bug then the
pm do all the above activitys. tis is the bug life cycle

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

How do you test calculator?

3 Answers  


What type of Testing u done ur project?

6 Answers   Quexst,


Hi anybody can answer this question with example. giving as it is i faced in interview................. What is TestPhase? What are Entry and Exit Criterias? Should explain with Example.

5 Answers   Ness Technologies,


What is configuration Management What is change management What are Severity and priority levels What is Data integrity and Data validity What are the browsers available and explain their versions Is it possible that Quality variates project to project What are GUI Map files and explain their Contents What is Data base check point and why we go for that What is the difference between the Client server application and a Web application Does Winrunner Supports Web applications What is process Management What is an Error, Defect, Bug What is Quality Which version of Winrunner you are using What is Build Verification and why we go for it What is Defect density What is Integration testing What is Static testing and types of Static testing What is Validation testing what is Data driven testing and why we go for data driven testing what is the definition of Testing What is Sanitation Testing

1 Answers   Semantic Space,


what is the function generator?

0 Answers   IBM, MBT,






developers take most of the time for coding and tester left very few time for testing say 2 days which testing u find best when ur project is run out of time and product is going to be released

3 Answers  


A server configuration is controlled from a single web page with multiple options: ● 20 drop-down menus, with 3-4 options each. ● 5 check-boxes. ● 1 multi-select menu, with 5 options. ● 1 template selection, with 6 options: A, B, C, D, E, F. ○ When options A, B, C, D are selected, all options (#1-#3) above are available. ○ When options E, F are selected, only 10 out of 20 drop-down menus have an effect. ● Besides item #4, developers input is that all options are independent, I.e., not impacting each other. What is the required number of test configurations required in order to test the server configuration and release in good quality: a) Assuming first release. b) Assuming regression tests for release with new features not impacted by the above options. Test configuration is a complete set of options that were selected to be tested in one complete server configuration scenario. I.e, a test configuration is set of 17 or 27 specific options tested together.

0 Answers   Mind Tree,


How Requirement is linked with traceability matrix. Give proper example

1 Answers  


How client/server application is complex?

1 Answers   IBM,


what is meant by port testing?

6 Answers  


what is test methodology and what is the format of that and who will prepare it

1 Answers  


What are the cases when you’ll consider to choose automated testing over manual testing?

0 Answers  


Categories