Answer / murali.msc03
As soon as Test Engineer finds a Bug will Raise the bug as
in NEW Status and will post it development Tl and Will keep
it in Open Status and assign it to concerned developer. and
he can change the status of bug as duplicate, As designed,
not Reproducable, if it is a bug then developer will work
on it and give it as Fix status. Then Tester will retest
that bug and see that it is reproducable or not if it is
not reproducable then he will close the bug, if its
reproduce the same bug then keeps it in reopen status.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / sreenivas
In my organization bug life cycle starts with a defect I
found and will shoot a mail to development lead keeping a
status as NEW, then development lead is going to assign it
to the developer as status OPENED (if it is really a bug),
then developer is going to fix that bug and shoot a mail to
directly to me(test engineer) saying it is FIXED. I will
retest(FIX VERIFY) that bug and shoot a mail to the test
lead if it is FIXED and finally test lead will change a
status of the bug to CLOSED by shooting a mail.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / ramireddy
when we found a defect set the status as New and set the
severity bug revied by the in our seniour people based on
the severity they will set the priority and then they will
assign to the corresponding developer based on the priority
developer fix it,and then assign to corresponding tester
and again r-tested he will fix correctly close the bug,if
it is reproducible then re-assign to the corresponding
developer.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sra1
as soon as tester receive the build or software the tester
test the application and execute the test case.if the
tester found the bug in the testing he l"l termed as "new".
the pm analyse the defect & he l'l give to the developer.
the developer l"l "open" it now the developer is rectifying
the bug.and after solving he l"l "fixed" he bug.then the
regression testing is oocured whether the bug is fixed or
not if fixed then the tester l"l "closed" it.if the bug is
not rectified then then the tester reports a bug then the
pm do all the above activitys. tis is the bug life cycle
| Is This Answer Correct ? | 0 Yes | 0 No |
How do menation in requirement no in testcase? CRS document should be change.Add new requirement in between in previous CRS. How do assain no in requirement. How do menation in testcase?
On what basis test engineer can find out TEST SCENARIOS???
What is deferred status in defect life cycle?
What is configuration management in software testing ?
Can any one please refer me the good book to study more abt testing manual as well as abt automated,in which i cld learn more abt to prepare test cases and more abt testing.If possible plz mail me the name of the book at : nitin9360@gmail.com regards Nitin
In my application there are 5 modules. In every module there are 8-9 sub-modules. Preview, Print & Download options are there on every sub-module screen. My Question is - Should I have to write that much test cases for Preview, Print & Download options???????? Please reply soon.
explain ur testing project? how can u nexplain . what should we explain ? i have not worked on any project?
what do u do in peer review?how do u do ? brahma412@yahoo.co.in July 24
Define Stress, Load, Volume Testing?
Once the build is given to the tester,what are the test he is going to conduct list them in chronological order .....its urgent
what are the different statuses of test cases?
What is test belt?