what box testers shouldn't look inside the
a. code
b. design
c. specification
d. none of the above
Answers were Sorted based on User's Feedback
Answer / pradeep
The answer is C.
White box testers should have the knowledge on the internal
code and they have to verify the code.
But they should not look at the functionality or the
specification. That is the job of the Black box
(Functional) Testers
Is This Answer Correct ? | 2 Yes | 1 No |
What are the Difficulties you found while testing your module ? plese give the possible difficulties.
What is white box testing and list the types of white box testing?
Explain what is 'test plan driven' or 'key word driven' method of testing?
What is 2 tier and 3 tier application? Pls illustrate it with appropriate example.
A man has Ten Horses and nine stables as shown here. [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] The man wants to fit Ten Horses into nine stables. How can he fit Ten horses into nine...
what is the difference between application server & web server?
What is Test Data Collection?
Is it like only you will do the UAT testing or the Client. How is UAT test cases different from Functional test cases?
1 Answers Cap Gemini, Tech Mahindra,
please help! Smoke Test Checklist for Gmail
"U2" has a concert that starts in 17 minutes and they must all cross a bridge to get there. All four men begin on the same side of the bridge. You must help them across to the other side. It is night. There is one flashlight. A maximum of two people can cross at one time. Any party who crosses, either 1 or 2 people, must have the flashlight with them. The flashlight must be walked back and forth, it cannot be thrown, etc. Each band member walks at a different speed. A pair must walk together at the rate of the slower man's pace: Bono: 1 minute to cross Edge: 2 minutes to cross Adam: 5 minutes to cross Larry: 10 minutes to cross For example: If Bono and Larry walk across first, 10 minutes have elapsed when they get to the other side of the bridge. If Larry then returns with the flashlight, a total of 20 minutes have passed and you have failed the mission. Notes: There is no trick behind this. It is the simple movement of resources in the appropriate order.
What is a user manual?
could you please send me the ISTQB Material to my mail id ankurcsc@gmail.com