what is role of the tester in an organaisation and project?
what is the daily work of tester?
Answers were Sorted based on User's Feedback
Hi,
Daily work as a tester is first I check my email. If I
have any review or walk through meeting I prepare for that,
if not I'll continue with work I left before day. While
writing the test cases I continue writing the test cases.
While I execute the test cases If any bugs are fixed I make
sure it is fixed and change the status of the bug and then
proceed with the execution of the test cases. Mean while
interaction with the developer is necessary.
Is This Answer Correct ? | 7 Yes | 0 No |
Answer / s.ramprasad
HI
Daily Work of a Tester.
1. Design Test cases.
2. Execute Test cases.
3. Bug or Defect Tracking.
4. Test Report.
5. Co-ordination To Prepare Test Plan.(Optional).
sun_ramprasad
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / arjun reddy n
The daily work of the tester depends on day to day
activities.
1) At the time of requirements the tester role would be
going through the requirements, prepare use cases and test
scenarios based on BRS.
2) At the Design Phase,the tester role would be in
preparing the test plan and test cases.
3) At the coding stage the tester will be getting builds
and according to the test cases he has to test the
applcation in all areas.If a bug is found, he has to report
to the developer and keep tracking the defects from build
to build.
4) Daily he has to report the bugs and the applcation
status through test reports.
5) Clarify the doubts regarding the applciation through
query log document to be sent to client.
Is This Answer Correct ? | 3 Yes | 1 No |
What is white-box Integration Testing and its differences between Black box-Integration testing?
are there any difference Between Error,Bug,Issue ? (defination wise)..
1. What is buddy Testing ? 2. what is Database testing ?
What is the difference between SIT AND IST?
Explain how to test the online trading software? How can we get the Feed values? Where they will store? How we test the Personal Trading account because it is time constraint.
As a testing engineer what to do if same defect is occured again in the software??
How you assign severity for a defect?
write a single scenario which describe error , bug and failure.
After insert the record in front-end, how will you check the back end by manually? Please explain?
What is Installability testing?
hi one of the interviewer asked me have you ever created a test plan?
what are the release notes and what release note contains, when these prepared.