How do you differentiate the roles of Quality Assurance
Manager and Project

Answers were Sorted based on User's Feedback



How do you differentiate the roles of Quality Assurance Manager and Project ..

Answer / dr. pavan

In my understanding, the question is to differentiate the
roles of QA manager and PM.
QA Manager is responsible for the quality of the product or
project where he and his team is working for where as a
project manager is responsible for project activities
according to BRD or SRS.
QA Manager will handle a team,in most of cases, and team is
responsible for verifying the product or project for
meeting the requirements of customer 100% and also checks
suitability at depicted scenario of customer at initial
stages of project, which was developed by project team and
monitor by project manager. Hence, QA Manager is
responsible for quality of the product and he will ensure
this by having peer reviews and other all sorts of reviews
to ensure the quality of the product.

Is This Answer Correct ?    0 Yes 0 No

How do you differentiate the roles of Quality Assurance Manager and Project ..

Answer / jagadish

the question is in complete r u preferring project manger or
project.
if project and qa manger then its completly differnt.
if qa manger with pm then pm is the person who is
responsible for the completion of the project with in given
time and with all the things as required (brs and srs
document) he manges ppl to work for this cause.
the qa manger is the persons looks in to the out come of the
project is fit for the business requirements of the project
is 100% done or not with his team of quality engginers.

Is This Answer Correct ?    2 Yes 4 No

How do you differentiate the roles of Quality Assurance Manager and Project ..

Answer / ferdinand martin

Quality Assurance Manager does the Marketing for the
product. Sells the product before its even completed.
He basically Assures the customer of a Quality Product.
Whereas a Project Manager gathers customer specification
through his QA manager and develops the product from start
to finish with his team and ensures that the product which
is to be rolled out is Defect free (i.e. readily useable).
The Project Manager should pay back the faith of his QA
Manager in selling the project to the customer.

Is This Answer Correct ?    4 Yes 10 No

Post New Answer

More Test Cases Interview Questions

write testcases to waterbottle?

1 Answers  


How to write test cases for the following scenario: The system shall limit the search result display to 200 records. Do we need to write test data for it. How do we create a test data for it.

0 Answers  


What is the smallest number of test cases required to Provide 100% branch coverage? If(x>y) x=x+1; else y=y+1; while(x>y) { y=x*y; x=x+1; } A. 1 B. 2 C. 3 D. 4

1 Answers   ISTQB,


What is quick test professional and what test environment it supports?

0 Answers  


Give me a sample test case for an online purchasing system?What testings u do for the same ?

8 Answers   Flipkart, NIIT, Polaris, SQTL, TCS,






How to write test case for this scenario. The data entry field for city shall be removed from the screen

1 Answers   SpinSci,


# A large IT company is in the process of revising salary structure for its employees. The salary will be on the basis of assessed performance of the previous year for all employee who have completed six months or more. # The rules for salary revision are provided below :- Performance level 1 : Increase existing salary by 30% Performance level 2 : Increase existing salary by 20% Performance level 3 : Increase existing salary by 10% Performance level 4 : Increase existing salary by 5% Performance level 5 : No Increase # For those who have not completed six months, provide a flat increase of 7.5% in their salary. In addition to above provide a special loyalty allowance of Tk. 800 to all employees who have complete THREE years with the organization. # Compute the minimum number of paths that you would require to cover the application and how many test cases would you require?

0 Answers  


Please let me know how to write a test case for Pen and washing machine.

3 Answers  


hi iam working in HCL as a fresher n iam dg automation testing i am going to give client demo i did some 7 scripts i want to call all those in some new page in QTP I KNOW CALL THE EXISTING ACTION N COPY OF ACTION if we use any of these options while running it will show the whole script but is there any other method while running it should not show the whole script it will show only the calling lines plz give me detailed explanation to ds i need reply fast plzz

2 Answers   HCL,


how to write test cases for smart meter for gas and electricty

0 Answers  


How many test cases u will write for Acceptance testing?

0 Answers  


write test case for banking application

1 Answers   Zeal Encore,


Categories