Hi guys
I am pravash kumar satapathy having 4.5yrs experience in loadrunner .i am providing online training in loadrunner,jmeter .if any body are interested directly u can call me or mail me

pravashkumarsatapathy@gmail.com
pk.loadrunner-----skype
9437629024


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Load Runner Interview Questions

If you want to stop the execution of your script on error, how do you do that?

2 Answers  


You want to have each step in your script measured as a transaction in the controller and not shown in the replay log in vugen. How can you accomplish this?

0 Answers  


How can we develop the database vuser script?

0 Answers  


how to get current system time Loadrunner function?

0 Answers  


I am getting the following error when I run a HTTP/HTML protocol script in controller. It simply says Error: 27764 - “https://..... Failed”. I was given 3 solutions but none of them worked. Offered solutions are 1. Change the Http version to 1.1 in the Run time settings of the script. – Changed but still got that error. (One of our team mate) 2. Check if I am running a mix of http and https Urls – Checked and I am only using Https URLs. (SQA forum) 3. In the controller, add all the scripts to one group using the ‘Vusers’ option – Done, But still getting errors. (Client) One thing I noticed is If the servers are restarted and the logs are cleared then the probability of getting this error is minimal but as the time grows between server restart, The number of error increases. If any of you have come across this before please help me in resolving this error

1 Answers  






I need to perform a 4hr test run in performance center 9.0 there i need to rampup 10 users after 1 hour. I selected the run tab and added users to down state -> Ready state-> initialise-> Run state. 10 users ramped up successfully for the next 1 iteration only after that the 10 users automatically goes to the stop status. But i want the ramped up users to be carried out for the next 3 hours. Please help me out how to do the rampup successfully for the remaining time period.

1 Answers  


Does any one know how to over come the problem of "monitoring the load generators over firewall". We are able to use these machines for load generation, but are not able to monitor the measurements of these machines. When tried to add these machines to the windows resources, we were getting the error "Monitor name :Windows Resources. Cannot connect to machine stresstestxp6:62043. Reason: The network path was not found." Also note that, we are able to ping/telnet the LG from the controller, but not the vice versa Is there any router settings to be made or any other configuration has to be done?

1 Answers  


what is the procedure to create test case in web performance load testing and how to download loadrunner and QTP

1 Answers  


what is the difference between placing a think time in between trasaction and the end of the transaction

3 Answers   GE, ProKarma,


why it is recommended to add verification checks to all your scenarios ?

12 Answers  


WHAT IS AUTOMATION TEST FRAME WORK

2 Answers   Sysnet,


While the script is running we find some values that may need to be correlated? Is it possible to do manual correlation for those values?

0 Answers  