i have 10 users, 20 itereatios and duration 1 minute
how can design this scenario.



i have 10 users, 20 itereatios and duration 1 minute how can design this scenario...

Answer / madan mohan reddy

every 6/s 2 users rampup and 30/s duration

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Load Runner Interview Questions

How can we develop the database vuser script?

0 Answers  


What is the process for developing a vuser script?

0 Answers  


Consider a business transaction, which is run in the LR tool (takes 2sec), but when run manually (takes 4sec). Please explain??

3 Answers   Keane India Ltd,


What the host attributes determine?

0 Answers  


which is best institute/trainer for load runner in bangalore

20 Answers  






In real time Project how much generaly Bottilneck will take? suppose my application contain 10000 vusers accessable how much Bottile neck will consider?

1 Answers   IBM,


how much memory will allocate for 1 vuser?

9 Answers   IBM,


In what situation the throughput will decrease even the hits per second increases???

3 Answers   CSC,


If you had 6 hours of load testing to complete but the business unit wanted it turned over in 3 hours what would you tell them?

1 Answers   Satyam,


Explain the Configuration of your systems?

1 Answers  


What are the different sections of the script?

0 Answers  


Explain the recording mode for web Vuser script?

6 Answers   Wipro,


Categories