how is the market for load runner in Hyderabad?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Load Runner Interview Questions

In which scenario, we should use "Vuser as Process" rather than "Vuser as Thread" and what is advantage of "Vuser as Process" option. (Please do not describe about Vuser as thread or advantages of vuser as thread).

4 Answers  


Can u plz tell me what r the functions available in load runner and how to write userdefined functions and what are they?

2 Answers  


What are all the important protocols that load runner supports?

0 Answers  


How many values can be generating in script we can Parameterize even it is in one scenario 1000Parameterization values are there it is correct to Parameterized?or not?

1 Answers   Accenture,


How do you decide the number of load generator machine required to run a test?

0 Answers  






which is best institute/trainer for load runner in bangalore

20 Answers  


what is meant by virtual users.what is the purpose of it.

8 Answers  


Explain about 90th percentile?

2 Answers   Accenture,


What is stand-alone mode?

0 Answers  


What is the difference between overlay graph and corelated graph?(Chandana)

1 Answers   TCS,


What r the arguments in lr_set_debug function

3 Answers   Symphony,


what is the difference between placing a think time in between trasaction and the end of the transaction

3 Answers   GE, ProKarma,


Categories