how will you clarify the requirements
Answers were Sorted based on User's Feedback
Answer / nitin sharma
It depends on Company to Company,In My project we clarify
the requiremens by reading FDS and SRS documents and Live
demo on the functionality given by the Client.
Is This Answer Correct ? | 28 Yes | 1 No |
Answer / sunita k
1. It is essential to have an understanding of the system
before starting work on it.
2. Ask the business teams to give a demo on the application
to understand the application
3. Some companies have trainings and certifications based
on the application
4. Once you receive the business requirement
documents/functional specifications, make a list of
questions module wise and list them down
5. Forward the questions to team leads and managers or save
in a common sharepoint site shared with onsite teams
6. PM's usually schedule meetings with business teams to
clarify the doubts
7. Good practice is to have a tracking sheet to track
responses to queries so that entire team goes thorugh it
and learns
Is This Answer Correct ? | 13 Yes | 4 No |
Answer / bond
If the requirement is not clear , meetings can be arranged with business user to clarify it.
Is This Answer Correct ? | 8 Yes | 2 No |
Answer / gouthami
1.Business Analyst will collect al requirements from client
and prepares BDD(Business Design Documet)
2.For functional knowledge TE's should read BDD
3.if TE's have doubts regarding reqirement(fxn knwledg)
should prepare Review Report Document and send that doc to
BA.
4.Conduct internal review meetings with participents of all
TE,s who are assigned foe same project and same module.
5.clarify doubts with BA.
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / suryapreddy
first discussion within team, esculate to leads and clarify
through chats, mails & calls
Is This Answer Correct ? | 6 Yes | 4 No |
Answer / t.venki reddy
first we analyse the customer needs with team members and
improve the existing process.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / amulyaranjan
Its vary from company to company,In my project we review the
FRS and BRS document, if we have any further doubt we will
discuss with our team member or author of the documents.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / ramana
If we need any clarification in the requirement, We make the list of queries module wise and save it in the common share point with team lead and managers.Also We maintained the tracking sheet to track the response to queries.So that entire team goes thorough it & learns.
Is This Answer Correct ? | 0 Yes | 0 No |
what are the outcomes of system testing?
1. Write configuration tests for a web based application. 2. How does a plane turn on ground? Explain with logic. 3. How would you test the volume control for a music system? 4. You have been given an application and you have only 15 mins to test the application. How would you do the testing? 5. Your machine, which is on a network has been disconnected. How you debug the problem? 6. What is the sum of numbers from 1 to 1000? 7. What is the probability that on rolling four dices same number appears on all dices? 8. You have been given 8 identical balls out of which one of them is heavier. How would find the heavier ball in the least number of tries with the help of a balance? Explain 9. There is a disc which has been painted half black and half white. You have been given sensors which could detect white or black colors. The disc is revolving in either clockwise or anticlockwise direction with variable angular speed. Find the minimum number of sensors required to determine the direction of rotation of the disc. 10. 64,54,42,31,20 which number does not fit in the series?
Work flow in testing in your company?
What is software development Life Cycle (SDLC)? where exactly the Testing activity begin in SDLC?
Which website will help me to get all manual interview questions at one place
What are the differences between web applications and client and server applications?
what is validation and verification of a bug?
What are the different phases available in STLC.
suppose the product/appication has to deliver to client at 5.00PM,At that time you or your team member caught a high severity defect at 3PM.(Remember defect is high severity) But the the client is cannot wait for long time.You should deliver the product at 5.00Pm exactly.then what is the procedure you follow?
How to explian the V model. Diagram not required but iwant the answer gnerally No Diagram explanation plzzzzzzzzzz..
Why do we write test cases?
What is the difference between SIT AND IST?