1.what are disadvantage of V model?
2. In V model two phase is there. That is verification and
validation.1St phase is verification , why it is called
verification?
Answers were Sorted based on User's Feedback
Answer / balu
Testing During Development is Called as verification
because in this phases will do only reviews of each pahse
not actual testing. where as Testing After Development is
called as Validation where actual testing is done
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / k reddy
this process(verification)mainly doing before coding so
this verify the developed project/product without excution
this verification doing entire v model
Is This Answer Correct ? | 2 Yes | 5 No |
Hi Im Swarupa I have 1 Year of exp in Software Testing.I was involved in manual testing of the applications.Pls let me know if you know abt any oppurtunities...Preferred location Hyderabad
what is the differance between debugging and testing?
a apllication is given to you but the requirements and functionalities are missing what will you do to start the testing?
Which one is not key term used in internal control and security Option 1 Threat Option 2 Risk Control Option 3 Vulnerability Option 4 Exposure
What is Facet Testing?
How do you decide when you have 'tested enough?'
what comes first test strategy or test plan
Tell me system level and integration level test case for telephone.
How do you go about testing a project?
What is test data set up?
what are the outcomes of system testing?
Can you explain process areas in cmmi?