Type of reviews is
Informal Reviews or (peer reviews)
Semiformal Reviews
Formal Reviews
Is This Answer Correct ? | 8 Yes | 1 No |
Answer / shantel
Journalism review
Advertising review
Criticism review
Rhetoric (writing) review
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / smooth mj
Book review
movie review
journal review
article review
music review
Is This Answer Correct ? | 1 Yes | 2 No |
Answer / llooolloollooll
Types of reviews are
Informal Reviews or (peer reviews)
Semiformal Reviews
Formal Reviews
Book review
Movie review
Journal review
Article review
Music review
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / nandakumar
1. Requirements Review
2. Specification Review
3. Architecture Review
4. Detailed Design Review
5. Code Walkthrough
Is This Answer Correct ? | 1 Yes | 4 No |
Answer / anuradha
buddy check
walkthrough
inspection (formal technical review ) >> black box testing
Is This Answer Correct ? | 0 Yes | 5 No |
Answer / rajendra
Types of Reviews:
1. Informal Review:
Generally one to one meeting.
No agenda.
Results are not formally reported.
Occurs as needed throughout each phase.
2. Semi Formal Review:
Facilitated by the author (the person who is responsible for
the activity).
Presentation is made with comment throughout and at the end.
Reports are distributed to the participants.
Possible solutions for defect not discussed.
Occur one or more times during phase.
3. Formal Reviews:
Facilitated by the modulator (the person who has link
between test engineer and
Management).
Assisted by a recorder.
Meeting are planned in advance.
Directly dependent on the preparation of participants.
Is This Answer Correct ? | 1 Yes | 7 No |
who is responsible for QA and QC?
list of methods that is used to document the requirements of a software.
!.what is the need for testing ?
what we get from srs doc ?
can any one send sample test cases for database testing by taking an example? also leave emailid please. thanks (very urgent)
Hi, I got an offer with maveric systems and I have around 3.5 years of work experience. But inspite of that they are asking to sign a bond for 2 years and to pledge all the original certificates for that bond. Can anybody please advice me whether its a good company or not and can i go ahead with this?
What is decision table testing?
what is vss?
change control
Which one of the project team members bears the responsibility of deferring new functionality to a later release?
Suggest some book to learn more test case???
Iam searching for a job in manual testing(2.9yrs exp) i faced no.of interviews they r asking me to tell me about ur project iwant to know, for any type of the project what are the steps,contents we have to tell about. so pls send the detailed description of copies to my email id.