In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
2854Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
L&T,
1 3465Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
Bhel,
1502How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
1786Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
1580Post New Civil Engineering Questions
what is w/c ratio in dry lean concrete for m10 mix design
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
Explain what are the problems one might face while having a Cantilever balcony?
pls give me ans to ACT formula cube testing porpuse
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
how i can tak Quantity of mortar in block work
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.Â