Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...



Certifications Interview Questions
Questions Answers Views Company eMail

The PRIMARY purpose of undertaking a parallel run of a new system is to: A. verify that the system provides required business functionality. B. validate the operation of the new system against its predecessor. C. resolve any errors in the program and file interfaces. D. verify that the system can process the production load.

2 16554

Change control procedures to prevent scope creep during an application development project should be defined during: A. design. B. feasibility. C. implementation. D. requirements definition.

2 6683

Which of the following would MOST likely ensure that a system development project meets business objectives? A. Maintenance of program change logs B. Development of a project plan identifying all development activities C. Release of application changes at specific times of the year D. User involvement in system specification and acceptance

2 7281

Which of the following is a measure of the size of an information system based on the number and complexity of a system?s inputs, outputs and files? A. Function point (FP) B. Program evaluation review technique (PERT) C. Rapid application design (RAD) D. Critical path method (CPM)

2 5655

When auditing the requirements phase of a software acquisition, the IS auditor should: A. assess the feasibility of the project timetable. B. assess the vendor?s proposed quality processes. C. ensure that the best software package is acquired. D. review the completeness of the specifications.

2 12515

The purpose of debugging programs is to: A. generate random data that can be used to test programs before implementing them. B. protect, during the programming phase, valid changes from being overwritten by other changes. C. define the program development and maintenance costs to be include in the feasibility study. D. ensure that program abnormal terminations and program coding flaws are detected and corrected.

KPMG,

2 17925

Software maintainability BEST relates to which of the following software attributes? A. Resources needed to make specified modifications. B. Effort needed to use the system application. C. Relationship between software performance and the resources needed. D. Fulfillment of user needs.

2 6005

IT governance ensures that an organization aligns its IT strategy with: A. Enterprise objectives. B. IT objectives. C. Audit objectives. D. Finance objectives.

2 11363

A validation which ensures that input data are matched to predetermined reasonable limits or occurrence rates, is known as: A. Reasonableness check. B. Validity check. C. Existence check. D. Limit check.

2 12691

During which of the following steps in the business process reengineering should the benchmarking team visit the benchmarking partner? A. Observation B. Planning C. Analysis D. Adaptation

2 7985

Which of the following procedures should be implemented to help ensure the completeness of inbound transactions via electronic data interchange (EDI)? A. Segment counts built into the transaction set trailer B. A log of the number of messages received, periodically verified with the transaction originator C. An electronic audit trail for accountability and tracking D. Matching acknowledgement transactions received to the log of EDI messages sent

2 8877

A utility is available to update critical tables in case of data inconsistency. This utility can be executed at the OS prompt or as one of menu options in an application. The BEST control to mitigate the risk of unauthorized manipulation of data is to: A. delete the utility software and install it as and when required. B. provide access to utility on a need-to-use basis. C. provide access to utility to user management D. define access so that the utility can be only executed in menu option.

2 7815

When conducting a review of business process re-engineering, an IS auditor found that a key preventive control had been removed. In this case, the IS auditor should: A. inform management of the finding and determine if management is willing to accept the potential material risk of not having that preventing control. B. determine if a detective control has replaced the preventive control during the process and if so, not report the removal of the preventive control. C. recommend that this and all control procedures that existed before the process was reengineered be included in the new process. D. develop a continuous audit approach to monitor the effects of the removal of the preventive control.

2 11276

Which of the following is an output control objective? A. Maintenance of accurate batch registers B. Completeness of batch processing C. Appropriate accounting for rejections and exceptions D. Authorization of file updates

2 7780

In a system that records all receivables for a company, the receivables are posted on a daily basis. Which of the following would ensure that receivables balances are unaltered between postings? A. Range checks B. Record counts C. Sequence checking D. Run-to-run control totals

2 8134


Un-Answered Questions { Certifications }

What is window in networking terms?

1311


Define ios?

1090


Can you explain PAP?

2031


Which is best insistute to learn IIS 6.0 and 7.0

2726


What is hold down time formula of ospf?

1213


What is the difference between dynamic ip and static ip addressing?

1218


What is the key advantage of using switches?

1211


why join as medical representative

2222


What is the difference between cross cable and straight cable?

1216


HI, I have completed my M.com and MBA and currently working in IT sector in HR Recruitment. i just want to do Oracle HRMS functional course. And is there is any study center in Coimbatore from where i can do this certification.

2357


I have done GNIIT software engneering and B.COM and also i have 1yr exp in oracle DBA can i do oracle DBA certification plz adviced me frnds....as early possible with certification details...

2772


Hello, This is Ritesh , having 4 year exp of Manual testing and 2 exp in CMMi. I can create Test cases and all activities which includes in manual testing. I know C language and can programm it. I have done all cmmi knowldge now I need to know the details like which certification I need to do if I want to do career in Software Process imrovment plz suggest me if there are placement also with certification. regards,

2090


Please send me Informatica 8.1 certification dumps, my mail id purushothk123@gmail.com

2195


I want take up LoadRunner Testing Certification. Can anyone help me with the Syllabus and some sample questions. Also please tell me how much it costs for the Basic level testing.

2445


What is the point-to-point protocol in ccna?

1153