when generator short circuit condition, the current how dissipates. or at short circuit voltage not available then current how can flow?
1758How to differentiate 220 Kv & 132 Kv line transmission tower if there are no specifications given on towers?
3 10889which motor is used in our Indian Ceiling fan -Capacitor start and run or Capacitor start? (during repair i saw only one capacitor so it should be start only)
5 15200why can we use cosine wave instead of sine in ac supply as both have same rms vale and ripple factor
2074Post New Power Grid Electrical Engineering Interview Questions
Where is gutter in ms word?
Enlist some of the key challenges that are faced while performing software testing.
How to create a file using vi editor? 2)how to delete a file in vi editor? 3)How to connect the server datastage to unix? what r the command lines we r using? 4)30 jobs r runnig in unix i want to find out my job. how to do this? give me command?
Do I need to upgrade my flash player to use beta 3?
Hi, I saw one mapping implemented by my seniors . In Expression transformation they implemented following logic. That is iif(is_date(in_UC_DATINV,'YYYYMMDD'),to_date(in_UC_DATINV,'Y YYYMMDD'),'Inventory Date is either invalid or null') Inventory_Date is validated only for is_date() But not validated for notisnull() . But error says “ either invalid or null “ why? Whether is_date() also check for not isnull() ? or in this logic something is different ? Please answer me . Advance thanks
How to Change the Windows wallpaper in code?
How do I make a cell diagonal in excel?
What ate the uses of snap point in debugging?
what is the challenging position faced in the testing not in point of management point of view it must be in the point of while testing the application?
Explain fold() operation in spark?
When should I use .net core?
How do I handle request/response using jms? : BEA Weblogic
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
what is JSF or Java Server Faces?
What is import javax swing * used for?