Questions Answers Category Views Company eMail




Answers / { saravanan }

Question { 22122 }

what is Project Sign Off?what you consider at this point?


Answer

project sign off means

we deliver the product to customer that time we preparing
the project sing off document

in this document having so many columns

like 1. project scope 2. limitations 3. hardware datails 4.
software details 5. work enviran ment 6.DB details

these are all the main points of the documents

thanks
sara.rk

Is This Answer Correct ?    8 Yes 0 No

Question { 13062 }

what is testing


Answer

s/w testing is a process used to identify correctness,
completeness and quality of developed computer software
* To verify that requirements are implemented correctly
* to identify defects before s/w deployment
* to help improve quality and reliability
* To make s/w predictable in behavior
* to reduce incompletaility and interoperability issues

Is This Answer Correct ?    2 Yes 0 No


Question { Semantic Space, 9691 }

what is the basic purpose of functional & load testing?


Answer

functional - A process of validating whether the product is
meeting the functional requirement or not.
Load - Load test ensures that product capable to work
(with stand) till the promised load or not.

Is This Answer Correct ?    0 Yes 0 No

Question { 5829 }

Who will participate in testcase review?


Answer

test case first review the testlead ,after review the
testlead he ll send all test case to PM (project maneger)
he only the main reviewer

Is This Answer Correct ?    0 Yes 1 No

Question { IBM, 40177 }

Difference between Severity & Priority?


Answer

hai

Severity - impact of the bug on the functionally
priority - order of important of the bug

Is This Answer Correct ?    7 Yes 8 No

Question { InterSoft, 6344 }

1.What is the difference between QA and verfication?
2.What is the difference between QA and verfication?
3.what is the difference between teststrategy and test
methodologies?
4.what is the difference between teststrategy and test
methodologies?


Answer

4. test strategy means what type of testing following in our
project ,like - fun testing,smoke testing, Regression
testing,......
Methodologies means - what procedure we will follow in our
testing environment like v-Model , water fall model, Boundary
value analysis's....

Is This Answer Correct ?    0 Yes 1 No

Question { 7248 }

difference b/w sanity testing and somke testing ?


Answer

sanity
A process of testing whether the CODE is ready for further
testing or Not

Smoke
A process of testing whether the BUILD is ready for further
testing or not

Is This Answer Correct ?    3 Yes 5 No

Question { CGI, 32631 }

Can anyone suggest atleast five test cases for a Pencil?


Answer

hai friends ,
Raheel sheikh ans is good

Is This Answer Correct ?    8 Yes 3 No

Question { 8542 }

When are the followings prepared:

1.Software Test Plan
2.User Acceptance Test Plan


Answer

1
hai,
test plan is diff from company to company and project to project
in my company following this type
test plans Contains
introduction
scope
future to be tested
future not to tested
test strategy
smoke testing
mutation testing
Functional testing
Reg ration testing........
suspension
resumption criteria
entry criteria
exit criteria
environment
software req
roles and responsibilities
test schedule
deliverables
training plan
Risk management
control procedure
dependency
Approval

Is This Answer Correct ?    2 Yes 1 No

Question { CTS, 7612 }

what is the diff b/n test plan and test strategy


Answer

test strategy - TS is the one of the content in the
testplan. what type of testing we are following in the
project like - smoke testing , re testing ,system testing
,regression testing, functional testing....
Test plan - test plan is document which will contain the
process needs to be followed to complete our task on project



thank you
saravanan.rk.qa@gmail.com

Is This Answer Correct ?    6 Yes 0 No

Question { 14169 }

What is the difference between the dropdown and checkbox
list??


Answer

1.Drop down having n no.of items
check box having only one option
2. in the drop down we r select more than one item
check box we select only on item

thanks

sara.rk

Is This Answer Correct ?    3 Yes 10 No

Question { IBM, 13363 }

what is difference between regression testing and re-
testing?


Answer

Regression Testing: Ensure that code change the particular
position (Module) in the Project , we need to check the
impact of the another Existing positon.

Re testing : Once the Developer has fix the Bug we need to
Retest the bug its called the Re testing

Is This Answer Correct ?    1 Yes 1 No