what will be the output of a temperature transmitter if
temperature is 120 degree celcius?


Answer

Lenin answer is correct. It will be 20mA when the
transmitter is calibrated to 0 - 120 DeG C

Is This Answer Correct ?    13 Yes 1 No

Question { 11606 }

How to check range of DP Transmitter


Answer

Explain breifly about ur query.

Is This Answer Correct ?    4 Yes 2 No


Question { 6519 }

What is pipe schedule?
What are all effects its having in the valve?
how do we take care of pipe sch in case if the customer dint
specify in the data sheet.
What we need assume and in what basis?


Answer

Thickness of the pipe is normally spelled in Schedule
example 1/2" Sch 40S,

Generally, ID (Inside diameter) of the pipe will vary by
varying the thickness but OD (Outside Diameter) remains
constant. But it is vice versa when we speak about tube,
where ID remains onstant and OD will change by varying
thichmess.

For a valve with welded end connection ,schedule of the
valve is needed, so that while joining valve with the pipe,
both ID of valve and pipe shall be matched. For that most
of cases schedule is important.

In case when pipe sch is not given, we have to follow ASME
31.3 code to find the required thickness for the design
pressure and temperature.

Is This Answer Correct ?    4 Yes 1 No

Question { 6519 }

What is pipe schedule?
What are all effects its having in the valve?
how do we take care of pipe sch in case if the customer dint
specify in the data sheet.
What we need assume and in what basis?


Answer

Clarification:
There are four end connections:
1. Butt weld
2. Socket weld
3. Threaded end
4. Flanged end

For butt welded and socket welded end valve, schedule is
important. For other no need.

But while connecting a pipe and a flange, schedule is
needed.

For joining any two components (a pipe with a valve)
through butt welding, ID of both should be match.

Pipe is designated by a "Nominal Pipe Size" based upon the
ID (inside diameter) of the most common wall thickness.
Tubing is designated by the measured OD (outside diameter).

Is This Answer Correct ?    2 Yes 0 No

Question { IBM, 30971 }

Please explain about FAT? What is the difference between
FAT and SAT?


Answer

Manoj Thanks for reply.

Could you please explain briefly. please

Is This Answer Correct ?    3 Yes 0 No

Question { IBM, 30971 }

Please explain about FAT? What is the difference between
FAT and SAT?


Answer

Thanks freinds,

Is FAT & SAT is applicable to individual instruments.

Is This Answer Correct ?    1 Yes 4 No

Question { 7236 }

if i change range of flow transmitter in th field then does
it need to change range in dcs?


Answer

No need to change the range in the DCS.

Is This Answer Correct ?    2 Yes 13 No