What will be current cost Rs. per Sq.Ft. of RCC slab for
home construction in sangli (maharashtra state)?
Answers were Sorted based on User's Feedback
Answer / mallik
Slab consists of 2 kg iron concrete labour charge
2 kg iron costs of 90 rs
Concrete 90 and labour 90
Total 270
| Is This Answer Correct ? | 71 Yes | 31 No |
Answer / kiran borude
100-140rs per sq feet..400-500 hote to sab log yahi kam karate bhaiyo
| Is This Answer Correct ? | 28 Yes | 2 No |
Answer / siddharth
As our construction it only need generally one kg steel that cost 40 rupee here and totally cost about 95-100 rs.
| Is This Answer Correct ? | 11 Yes | 6 No |
Answer / dave tushar
450- 500 rupees per sq.ft
Mostly depend on different charge of labour & quality of used materials
| Is This Answer Correct ? | 9 Yes | 9 No |
Answer / gopal sharma
125 to 130 including all.. like labour+ material
| Is This Answer Correct ? | 6 Yes | 14 No |
what cut of marks in cgl2010 tier2
what is the difference between load bearing structure and framme structure?
What is the difference between (with what type of material they are made of)RAM cells and Cache memory cells
. A BSC can contain ___________ number of BCF packs.
what is the difference between R/3 Internet sales and CRM Internet sales?can a plant be assigned to multiple company codes?can a sales org. be assigned?
Is there any structure that you've been in that it was difficult to leave?
Discuss the concept of system transition strategy.
Who can give me Stracher Design for my plan For Coloum Position. Please call me 9921761702
Iam commiting an argument that postmodern architecture is copied. In particular I am researching into the structure of domes. If you could give me any advise or references to back my argument it would be much appreciated.
How to calculate stabilizer for a machine
how much steel bar is required for 1400qrs feet r.c.c slab
data retrival is faster when we use PPI in a table. But my question is is PPI affects the Multiload performence my any chance?