Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Discuss the concept of
system transition
strategy.



Discuss the concept of system transition strategy...

Answer / ragini srivastav

During the systen
operations and support
phase of system 1 as a
decision event(1)
occurs to replace
systen 1. The
acquisition strategy is
to bring the new
systen2 "on-line" or
into active service as
noted by the first
article field delivery(5)
event.

Is This Answer Correct ?    7 Yes 4 No

Post New Answer

More Architecture Design AllOther Interview Questions

how much steel is required for 40*35 ft roof slab41/2" thick.what is the spacing from bar to bar.

0 Answers   Asian Paints,


what is CEPT and ETSI for telecom?

0 Answers   Nokia,


How is BP in CRM synchronised with R/3? What r all the steps involved?can we do the partner determination based on SALES AREAS?

0 Answers  


1. What are the three services offered by GSM? Explain each of them briefly.

1 Answers   Nokia,


Is there any difference between interrupt and acknowledgment?

0 Answers  


What is the name of the first type of building used in Christian Churches?

0 Answers   RRB,


How to construct BUILDINGS in a very busy and very narrow roads with out causing much disturbance to others?

0 Answers  


What is a buttress? How is it different from a flying buttress?

0 Answers  


Is this house typical of the houses of this community? What makes it typical or atypical?

0 Answers  


RCC colums of 15"X9" each, roof height 20.5'ft, total pillars 36 nons. Span between pillar to pillar is 16/20/20 length wise and 16/14 width wise. Total Slab area 8000 sft and plinth area is 1900 sft. beams are 12"X9". kindly calculate load factor per sqft.

1 Answers   ITI,


how much steel required for 1 sq area for swimmin pool construcion

0 Answers  


what is the use of studing architecture

0 Answers  


Categories
  • Interior Design Interview Questions Interior Design (21)
  • Architecture Design AllOther Interview Questions Architecture Design AllOther (186)