hi ,
This is krish from chennai . i like to do istqb
certification for foundation level . if any one have
material for that kidely help me. just send me the material
to krishmca29@rediffmail.com. thanks is advance for
sending .
No Answer is Posted For this Question
Be the First to Post Answer
How do you determine which piece of software require how much testing?
What are the actual QA processes run in software compamy ?
What are the factors responsible for the estimation of system integration test cycle and total integration time?
What would you do if you have a large suite to execute in very less time?
at any application or software where the data will be stored at server side or at client side kindly answer it in detail?
Is the functional testing is a part of System testing. Are they same.
How can new software qa processes be introduced in an existing organization?
steps for perfoming integration testing?
How is Release Management is done in STLC. What are tools can be used for the same.
can anybody explain me the role of QA in every phase of SDLC (PHASE WISE) to privent from bug.with real life example.1)requirement analy.2)designing 3)coding 4)testing 5)implementation 6)maintenance. PHASE WISE
What do you like least about Quality Assurance/Testing?
What types of documents would you need for QA, QC, and Testing?