In a Dark Room one Switch Board is there.If u Pressed a
Button in Switch Board the Light will 'ON'. Write the
Possible test cases?

Answers were Sorted based on User's Feedback



In a Dark Room one Switch Board is there.If u Pressed a Button in Switch Board the Light will ..

Answer / venumaha

1)Verify the Room is in dark or not
2)Verify the darkroom should have switch board accordingly.
3)Verify the switch board, should have switch with two way
action ie On/ OFF.
4)Verify the bulb when you switch on exists in the switch
board.
5)Verify the bulb when you switch off, exists in the switch
bord.

Actual Results:
1a)The room should be dark with out having any light,
2a)The dark room should have switch board appropriately.
3a)The buld should glow when we switch on
4a)The bulb should not glow when we do switch off.

Is This Answer Correct ?    2 Yes 0 No

In a Dark Room one Switch Board is there.If u Pressed a Button in Switch Board the Light will ..

Answer / guest

1.Blub will glow in normal.
2.Blub will glow with low volatge.
3.Blub will glow with high volatge.
4.Blub will glow with very high volatge and burn

Is This Answer Correct ?    1 Yes 0 No

In a Dark Room one Switch Board is there.If u Pressed a Button in Switch Board the Light will ..

Answer / durga prasad ms

I think we can write positive and negative also

1. Switch on the light and light should glow

2. Switch off the light and it should off

3. Switch on another button light should not glow(we can do
the same with other switches also)

4. Now switch on the first button again another light
should not glow (if it is there)

Is This Answer Correct ?    1 Yes 0 No

In a Dark Room one Switch Board is there.If u Pressed a Button in Switch Board the Light will ..

Answer / venkat

Electricity should be there.
Bulb should be there.
Connection between bulb and switch.
Working condition of the switch.

Is This Answer Correct ?    1 Yes 1 No

In a Dark Room one Switch Board is there.If u Pressed a Button in Switch Board the Light will ..

Answer / ritu

1.Verify the location of Switch Board. Exp Result:- Switch
Board should be reachable.
2. Verify the Button quality. Exp Result:- Button should be
pressed after on, off.
3.Verify the functionality of button. Exp Result:- 1.Light
should be ON after ON.2. Light should be OFF after OFF.
4. Verify the button functionality for continous use. Step:-
Continuous ON OFF the button. Exp Result:- Button should
work fine.

Is This Answer Correct ?    0 Yes 0 No

In a Dark Room one Switch Board is there.If u Pressed a Button in Switch Board the Light will ..

Answer / sambasiva reddy,ahamed ali

1.Conditional Specification:Mentioned Dark Room.
2.Swith Board:"Press" Bulb glows.

Basis paths coverage to implement a successful glow of bulb
while switch is Pressed
1.Bulb is existed.

Pre-Requirement.
To make the test case criteria :pass/fail in a dark room
search for the switch board.
The approach u make to find is heuristic search.

Test Case Action Expected

Switch On "Press"Switch Bulb glows

Is This Answer Correct ?    0 Yes 1 No

In a Dark Room one Switch Board is there.If u Pressed a Button in Switch Board the Light will ..

Answer / s.ram prasad.

HI

pre_Requeste: Make Sure The Switch Board Exists.

Test Data: "Switch on The Press Button".

Test Action: 1.Test Procedure: Find the switch Board &
press the Bitton.
2.Test Description: check Whether the Light
Glows.

Test Exp Result : The Light should Glow.

S.Ramprasad. Sun_ramprasad@yahoo.com

Test Avl Result :

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Manual Testing Interview Questions

how to know testing of application is finished? because i have a situation from my lead what u r testing u r missing some bugs?

7 Answers  


An employee table, with the columns id, name, sal and dob.Query to select emp names of all highest salaries(there are 4-5 people having the same salary which happens to be the highest).

5 Answers   ADP,


You have raised a priority 1 bug that needs to be fixed for release tonight, the developer concerned is refusing to fix this, what do you do and why?

2 Answers   HCL,


how can we give (ASSIGN) bug privitorirs and seviroty to the bug explain with exanple

0 Answers   Satyam,


How will you link the Defect to the test case? Explain Bug life cycle

2 Answers   IBM,






How to measure testing Productivity ?

0 Answers  


 You are New to the city,You don't have any Gadgets,you have   only address on paper piece.You are almost nearer to your destination, You have asked one man and he replied saying "Go straight and take Right(Dead End)".After moving some distance you have asked another person and he replied saying "Go straight and take Left (Dead End).And finally question here is As a tester which path you can choose and why? 

5 Answers   Bally Technologies, SSS,


How will you decide that the software is ready for release? Please if any one knows this answer, submit the answer as early as possible.

10 Answers   TCS,


what is the main field of bugzilla which we fill to report bug to any developers???give some brief description??

1 Answers  


1.What is configuration Management? 2. Explain Impact Analysis 3. Explain Peer Review 4. what i kickoff phase of Formal Review. 5. Whatv are the phases of fundamental test process. 6. what is state transition testing. 7. what is LCSAJ 8. Test conditions are derived from where?

0 Answers  


Guys, can any one of u give the realtime example for Beta Testing

3 Answers  


What is The difference between Sanity Testing and Regression Testing

8 Answers  


Categories