A power unit is there by the bank of the river of 900 mtr
width. a cable is made from power unit to power a plant
opposite to that of the river and 3000 mtr away from the
power unit. The cost of the cable bellows water Rs5 / mtr
and cost of cable on the bank is Rs 4/ mtr. Find the total
of laying the cable.
Answers were Sorted based on User's Feedback
If 1square=4, 2square=10, 3square=21 then 4square=__?
18 Answers EA Electronic Arts, SSM,
WHAT WOULD BE THE POSSIBLE APTITUDE QUESTIONS FOR THE HR EXECUTIVE OR FOR THE SR HR EXECUTIVE ?????
virtual memery size depand on
all general aptitude question
Under CICS, multitasking achieved by what method? A. virtual paging. B. task switching. C. priority numbering, D. pseudo conversational
A person sold two articles for 80 /- each.with 20% profit on one article and 20% loss on another article, what is the loss / profit he will gain on both.
One passage was on playing cards. know how many diamonds and etc.
One watch is showing 30 past 3 .What is the angle between minutes & hours hand?
What is the optimal size of a project team, above which additional members do not contribute productivity equivalent to the percentage increase in the staff size?
The length of the base of a triangle is three times the height. The area of the triangle is 24 square inches. Find the length of the base of the triangle. (Area=1/2bh)
C1,C2 upto Cn are n cities in a country.There are some roads connecting these cities.They are connected in such a that Crth city has r distinct routes connecting each of the other city in the country. 1)if n=27,then how many roads are there in a country? 2)if n=4,in how many distinct routes,can a person travel from c3 to c2?
Mohan started running from point A along with a circle of 1400 meter radius with the speed of 12 Km/hr. Ram also started running in the opposite direction from the same point with the speed of 15 km/hr. Both started at 9:00 AM. At what time will they meet first time? 9:15 AM 9:25 AM 10:00 AM 9:20 AM None of the Above