For the 7 stages of the SDLC (Planning, Analysis, Design, Development, Testing, Implementation, and Maintenance), What are the major inputs and outputs of each stage? What are the primary activities in each stage? Who are the primary "players" involved in each stage (e.g., Tech Arch's BA's, Testers etc.)?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Testing AllOther Interview Questions

What is path analysis?

0 Answers  


Testing that checks that a modification applied during maintenance has NOT affected the code corresponding to those functions of the system that should be unaffected by the modification is called which one of the following? 1. Acceptance testing 2. Unit testing 3. Regression testing 4. Validation testing 5. System testing

5 Answers  


Explain virtual memory?

0 Answers  


Where do you see yourself five years from now?

5 Answers   Hexaware, RBI,


What are your salary requirements?

1 Answers  






HI, I am Praveen Saini having 5 yrs experience in s/w Testing field. I am looking change. I am having QTP 1.5 Yrs. + 3.5 Manual testing. If someone having position, lease let me know. sainipra@gamil.com 9811465496

0 Answers  


Can nyone tell me about the testing certifications. I have planned to give a certification exam, but dont know which 1 is good.

2 Answers   IBM,


What is software requirements specification?

0 Answers  


What is Recovery Scenario

0 Answers   Wells Fargo,


What is the point of reference by which something can be measured? 1. Benchmark 2. Baseline 3. Metric 4. Measure 5. Indicator

4 Answers  


which testing we do during requirements? a. white box testing b. black box testing c.both testing d.none

7 Answers  


What is test/qa team lead?

0 Answers  


Categories