For the 7 stages of the SDLC (Planning, Analysis, Design, Development, Testing, Implementation, and Maintenance), What are the major inputs and outputs of each stage? What are the primary activities in each stage? Who are the primary "players" involved in each stage (e.g., Tech Arch's BA's, Testers etc.)?
No Answer is Posted For this Question
Be the First to Post Answer
What is path analysis?
Testing that checks that a modification applied during maintenance has NOT affected the code corresponding to those functions of the system that should be unaffected by the modification is called which one of the following? 1. Acceptance testing 2. Unit testing 3. Regression testing 4. Validation testing 5. System testing
Explain virtual memory?
Where do you see yourself five years from now?
What are your salary requirements?
HI, I am Praveen Saini having 5 yrs experience in s/w Testing field. I am looking change. I am having QTP 1.5 Yrs. + 3.5 Manual testing. If someone having position, lease let me know. sainipra@gamil.com 9811465496
Can nyone tell me about the testing certifications. I have planned to give a certification exam, but dont know which 1 is good.
What is software requirements specification?
What is Recovery Scenario
What is the point of reference by which something can be measured? 1. Benchmark 2. Baseline 3. Metric 4. Measure 5. Indicator
which testing we do during requirements? a. white box testing b. black box testing c.both testing d.none
What is test/qa team lead?