Answer Posted / ragini srivastav
During the systen
operations and support
phase of system 1 as a
decision event(1)
occurs to replace
systen 1. The
acquisition strategy is
to bring the new
systen2 "on-line" or
into active service as
noted by the first
article field delivery(5)
event.
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
what is the maximum depth at which the open foundation bridge can be done
what is the difference between R/3 Number range and CRM range?
Why did the wall of Romanesque Churches have to be so thick?
what is the rate of 4000sqft rate, with material tile plumbing all work with plinth? Pl. Send ans. Yourlifeme@indiatimes.com
types of load
Who is responsible for territory? can you please help me in getting the answer for this
what type of mapping is most used in maya production house?
i am looking for Final year Architecture Designer or any home based project worker in chennai. contact 9500092822
how to measure 4mm,6mm,12mm,18mm plywood into a cubic meter and how many layers in a cubic meter
what is the use of studing architecture
Hi i am going to attend Deputy Architect interview in Telecommunication Dept. through UPSC I dont know the type of questions they will ask. I will be very thankful if anyone could help me. Please send to my email-id ganesh_dev@rediffmail.com Please any one have experience of some other Dept., please reply me. my interview in on 10th of Nov. only 5 days left. please help.
What is the more accurate formula to convert wet concrete to dry aggregate instead of the 54% method?
What is meant by fetch and execute cycle in cpu operations
Is this house typical of the houses of this community? What makes it typical or atypical?
how do we calculate lux for museum building? what is the procedure?