Answer Posted / ragini srivastav
During the systen
operations and support
phase of system 1 as a
decision event(1)
occurs to replace
systen 1. The
acquisition strategy is
to bring the new
systen2 "on-line" or
into active service as
noted by the first
article field delivery(5)
event.
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
how much steel bar required for 1 sqm area
how do we calculate lux for museum building? what is the procedure?
what are the thump rules of taking BOQ of building construction?nallaPERUMAL 9003858728.
Who is responsible for territory? can you please help me in getting the answer for this
what is the difference between R/3 Number range and CRM range?
What feature is unique to the Hagia Sophia?
Structural wall & slab : Binding wire fixing is alternatively spacing is correct or wrong?. binding wire fixing is all spacing is must or not?
How did you decide to go into architecture and what did you do to prepare for this field of work?
how much steel required for 1 sq area for swimmin pool construcion
The telecommunications offered by the GSM PLMN may be divided into three main groups.what is it?
details about telephone wiring
How is BP in CRM synchronised with R/3? What r all the steps involved?can we do the partner determination based on SALES AREAS?
what type of mapping is most used in maya production house?
Noisy laptop My Toshiba Laptop, Model: Satellite L355-S7905 is making from time to time ugly noise like sparks, not to mention the sound of the fan. What shall I do?
What is the name of the first type of building used in Christian Churches?