Hi, this is not a tech question, i have 4 yrs of experience in Mainframe systems, presently as a mainframe tester in pune, i just want to step towards south locatios(preferable hyd), suggest me the best way to get calls from hyd.
No Answer is Posted For this Question
Be the First to Post Answer
integration testing is followed by a)unit testing b) system testing c) acceptance testing d) regression testing
what is regression testing and what is system testing? whaen we will do the regression testing and when we will do the system testing?
how do we update the test cases if the requirements change in manual testing. if we r not using quality center. depending on the changed requirements do i need to write a new test case or can we update the old test case.basically i want to update i dont want to write a new test case. so plzzzzzz answer.
could any body tell good ISTQB institute in Hyderabad?
is it necessary to write test cases in "tabular" form or will it be fine if written "point wise".
how can we upload manual test cases in testdirector
How do you determine what to test?
What is CMM-1,2,3,4,5 Level Company? How much levels are there like CMM?
What are the differences between web applications and client and server applications?
if a project is long term project , requirements are also changes then test plan will change or not?why
What is negative path testing?
In Manual testing BDD meaning