Utility programs that assemble software modules needed to
execute a machine instruction application program version are:

A. text editors.

B. program library managers.

C. linkage editors and loaders.

D. debuggers and development aids.



Utility programs that assemble software modules needed to execute a machine instruction application..

Answer / guest

Answer: C

Utility programs that assemble software modules needed to
execute a machine instruction application program version
are linkage editors and loaders.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

An IS steering committee should: A. include a mix of members from different departments and staff levels. B. ensure that IS security policies and procedures have been executed properly. C. have formal terms of reference and maintain minutes of its meetings. D. be briefed about new trends and products at each meeting by a vendor.

1 Answers  


An IS auditor performing a review of the backup processing facilities should be MOST concerned that: A. adequate fire insurance exists. B. regular hardware maintenance is performed. C. offsite storage of transaction and master files exists. D. backup processing facilities are tested fully.

1 Answers  


Which of the following IS functions may be performed by the same individual, without compromising on control or violating segregation of duties? A. Job control analyst and applications programmer B. Mainframe operator and system programmer C. Change/problem and quality control administrator D. Applications and system programmer

2 Answers  


Which of the following independent duties is traditionally performed by the data control group? A. Access to data B. Authorization tables C. Custody of assets D. Reconciliation

1 Answers  


Which of the following procedures would BEST determine whether adequate recovery/restart procedures exist? A. Reviewing program code B. Reviewing operations documentation C. Turning off the UPS, then the power D. Reviewing program documentation

1 Answers  






An IS auditor, performing a review of an application?s controls, discovers a weakness in system software, which could materially impact the application. The IS auditor should: A. Disregard these control weaknesses as a system software review is beyond the scope of this review. B. Conduct a detailed system software review and report the control weaknesses. C. Include in the report a statement that the audit was limited to a review of the application?s controls. D. Review the system software controls as relevant and recommend a detailed system software review.

1 Answers  


An IS auditor reviews an organization chart PRIMARILY for: A. an understanding of workflows. B. investigating various communication channels. C. understanding the responsibilities and authority of individuals. D. investigating the network connected to different employees.

1 Answers  


A TCP/IP-based environment is exposed to the Internet. Which of the following BEST ensures that complete encryption and authentication protocols exist for protecting information while transmitted? A. Work is completed in tunnel mode with IP security using the nested services of authentication header (AH) and encapsulating security payload (ESP). B. A digital signature with RSA has been implemented. C. Digital certificates with RSA are being used. D. Work is being completed in TCP services.

2 Answers  


A team conducting a risk analysis is having difficulty projecting the financial losses that could result from a risk. To evaluate the potential losses the team should: A. compute the amortization of the related assets. B. calculate a return on investment (ROI). C. apply a qualitative approach. D. spend the time needed to define exactly the loss amount.

1 Answers  


Which of the following would provide a mechanism whereby IS management can determine if the activities of the organization have deviated from the planned or expected levels? A. Quality management B. IS assessment methods C. Management principles D. Industry standards/benchmarking

1 Answers  


Which of the following is the PRIMARY reason for involving an IS auditor in the definition of a system's requirements? A. Post-application reviews do not need to be performed. B. Total budgeted system development costs can be reduced. C. It is costly to institute controls after a system becomes operational. D. The extent of user involvement in design activities is reduced.

1 Answers  


Which of the following activities should the business continuity manager perform FIRST after the replacement of hardware at the primary information processing facility? A. Verify compatibility with the hot site. B. Review the implementation report. C. Perform a walk-through of the DRP. D. Update the IS assets inventory.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)