Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Congestion control is BEST handled by which OSI layer?

A. Data link

B. Session layer

C. Transport layer

D. Network layer

Answers were Sorted based on User's Feedback



Congestion control is BEST handled by which OSI layer? A. Data link B. Session layer C. Tra..

Answer / guest

Answer: C

The transport layer is responsible for reliable data
delivery. This layer implements a flow control mechanism
that can detect congestion, reduce data transmission rates
and increase transmission rates when the network appears to
no longer be congested (e.g., TCP flow controls). The
network layer is not correct because congestion control
occurs based on router implementations of flow control at
the subnet level (i.e., source quench messages sent out when
router memory or the buffer reaches capacity), however, no
message exists to cancel or discard messages, which actually
may increase congestion problems. Session layer and data
link do not have any functionality for network management.

Is This Answer Correct ?    34 Yes 22 No

Congestion control is BEST handled by which OSI layer? A. Data link B. Session layer C. Tra..

Answer / raju

transport layer

Is This Answer Correct ?    12 Yes 3 No

Congestion control is BEST handled by which OSI layer? A. Data link B. Session layer C. Tra..

Answer / vidushi singhal

D

Is This Answer Correct ?    11 Yes 12 No

Post New Answer

More CISA Certification Interview Questions

When reviewing a system development project at the project initiation stage, an IS auditor finds that the project team is following the organization's quality manual. To meet critical deadlines the project team proposes to fast track the validation and verification processes, commencing some elements before the previous deliverable is signed off. Under these circumstances, the IS auditor would MOST likely: A. report this as a critical finding to senior management. B. accept that different quality processes can be adopted for each project. C. report to IS management the team's failure to follow quality procedures. D. report the risks associated with fast tracking to the project steering committee.

1 Answers  


Which of the following is an example of the physiological biometrics technique? A. Hand scans B. Voice scans C. Signature scans D. Keystroke monitoring

2 Answers  


When a systems development life cycle (SDLC) methodology is inadequate, the MOST serious immediate risk is that the new system will: A. be completed late. B. exceed the cost estimates. C. not meet business and user needs. D. be incompatible with existing systems.

1 Answers  


Which of the following is the operating system mode in which all instructions can be executed? A. Problem B. Interrupt C. Supervisor D. Standard processing

1 Answers  


A PRIMARY benefit derived from an organization employing control self-assessment (CSA) techniques is that it: A. can identify high-risk areas that might need a detailed review later. B. allows IS auditors to independently assess risk. C. can be used as a replacement for traditional audits. D. allows management to relinquish responsibility for control.

1 Answers  


The responsibilities of a disaster recovery relocation team include: A. obtaining, packaging and shipping media and records to the recovery facilities, as well as establishing and overseeing an offsite storage schedule. B. locating a recovery site if one has not been predetermined and coordinating the transport of company employees to the recovery site. C. managing the relocation project and conducting a more detailed assessment of the damage to the facilities and equipment. D. coordinating the process of moving from the hot site to a new location or to the restored original location.

1 Answers  


Testing the connection of two or more system components that pass information from one area to another is: A. pilot testing. B. parallel testing C. interface testing. D. regression testing.

2 Answers  


An IS auditor recommends that an initial validation control be programmed into a credit card transaction capture application. The initial validation process would MOST likely: A. check to ensure the type of transaction is valid for that card type. B. verify the format of the number entered then locate it on the database. C. ensure that the transaction entered is within the cardholder's credit limit. D. confirm that the card is not shown as lost or stolen on the master file.

1 Answers  


Which of the following applet intrusion issues poses the GREATEST risk of disruption to an organization? A. A program that deposits a virus on a client machine B. Applets recording keystrokes and, therefore, passwords C. Downloaded code that reads files on a client's hard drive D. Applets opening connections from the client machine

1 Answers  


A data center has a badge-entry system. Which of the following is MOSTimportant to protect the computing assets in the center? A. Badge readers are installed in locations where tampering would be noticed B. The computer that controls the badge system is backed up frequently C. A process for promptly deactivating lost or stolen badges exists D. All badge entry attempts are logged

5 Answers  


Which of the following can be used to verify output results and control totals by matching them against the input data and control totals? A. Batch header forms B. Batch balancing C. Data conversion error corrections D. Access controls over print spools

1 Answers  


For which of the following applications would rapid recovery be MOST crucial? A. Point-of-sale system B. Corporate planning C. Regulatory reporting D. Departmental chargeback

2 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)