Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Which of the following is MOST likely to occur when a system
development project is in the middle of the
programming/coding phase?

A. Unit tests

B. Stress tests

C. Regression tests

D. Acceptance tests



Which of the following is MOST likely to occur when a system development project is in the middle o..

Answer / guest

Answer: A

During the programming phase, the development team should
have mechanisms in place to ensure that coding is being
developed to standard and is working correctly. Unit tests
are key elements of that process in that they ensure that
individual programs are working correctly. They would
normally be supported by code reviews. Stress tests,
regression tests and acceptance testing would normally occur
later in the development and testing phases. As part of the
process of assessing compliance with quality processes, IS
auditors should verify that such reviews are undertaken.

Is This Answer Correct ?    6 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

An IS auditor reviews an organization chart PRIMARILY for: A. an understanding of workflows. B. investigating various communication channels. C. understanding the responsibilities and authority of individuals. D. investigating the network connected to different employees.

1 Answers  


The rate of change of technology increases the importance of: A. outsourcing the IS function. B. implementing and enforcing good processes. C. hiring personnel willing to make a career within the organization. D. meeting user requirements.

1 Answers  


Which of the following is a control to detect an unauthorized change in a production environment? A. Denying programmers access to production data. B. Requiring change request to include benefits and costs. C. Periodically comparing control and current object and source programs. D. Establishing procedures for emergency changes.

1 Answers  


Which of the following tests confirm that the new system can operate in its target environment? A. Sociability testing B. Regression testing C. Validation testing D. Black box testing

1 Answers  


A number of system failures are occurring when corrections to previously detected errors are resubmitted for acceptance testing. This would indicate that the maintenance team is probably not adequately performing which of the following types of testing? A. Unit testing B. Integration testing C. Design walk-throughs D. Configuration management

1 Answers  


To prevent an organization's computer systems from becoming part of a distributed denial-of-service attack, IP packets containing addresses that are listed as unroutable can be isolated by: A. establishing outbound traffic filtering. B. enabling broadcast blocking. C. limiting allowable services. D. network performance monitoring.

1 Answers  


A strength of an implemented quality system based on ISO 9001 is that it: A. guarantees quality solutions to business problems. B. results in improved software life cycle activities. C. provides clear answers to questions concerning cost-effectiveness. D. does not depend on the maturity of the implemented quality system.

2 Answers  


When reviewing a system development project at the project initiation stage, an IS auditor finds that the project team is following the organization's quality manual. To meet critical deadlines the project team proposes to fast track the validation and verification processes, commencing some elements before the previous deliverable is signed off. Under these circumstances, the IS auditor would MOST likely: A. report this as a critical finding to senior management. B. accept that different quality processes can be adopted for each project. C. report to IS management the team's failure to follow quality procedures. D. report the risks associated with fast tracking to the project steering committee.

1 Answers  


The BEST time to perform a control self-assessment involving line management, line staff and the audit department is at the time of: A. compliance testing. B. the preliminary survey. C. substantive testing. D. the preparation of the audit report.

1 Answers  


As a business process reengineering (BPR) project takes hold it is expected that: A. business priorities will remain stable. B. information technologies will not change. C. the process will improve product, service and profitability. D. input from clients and customers will no longer be necessary.

3 Answers  


An IS auditor, performing a review of an application?s controls, discovers a weakness in system software, which could materially impact the application. The IS auditor should: A. Disregard these control weaknesses as a system software review is beyond the scope of this review. B. Conduct a detailed system software review and report the control weaknesses. C. Include in the report a statement that the audit was limited to a review of the application?s controls. D. Review the system software controls as relevant and recommend a detailed system software review.

1 Answers  


LANs: A. protect against virus infection. B. protect against improper disclosure of data. C. provide program integrity from unauthorized changes. D. provide central storage for a group of users.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)