How to track the requirement from bugzilla tools?
As our project requirement are changing frequestly and all
are tracked in bugzilla tool. How to manage all as all
project having short term duration. Please reply back ASAP?
Thanks in advanced?
Answer / Ruby Yadav
To effectively manage project requirements using Bugzilla, follow these steps:
1. Create a new bug for each requirement change.
2. Assign the bug to the appropriate team member or group.
3. Prioritize bugs based on their impact and urgency.
4. Use labels or keywords to categorize and filter bugs.
5. Monitor the progress of each bug, including its status and any associated comments.
6. Keep the Bugzilla database up-to-date with any new requirement changes.
| Is This Answer Correct ? | 0 Yes | 0 No |
hai, this is neelima... what is testing...?wht r the types of testing...?
HOW DO YOU COMMUNICATE WITH THE DEVELOPER ON DEFECT?
Hi Guy's Pls. go to Forum of Allinterview.com for Testing Job Openings..You can find various job openings in Forum. You can submit ur resume too
words Mortal Combat, Street Fighter, Dead or Alive and Doom have in common?
A type of integration testing in which software elements, hardware elements, or both are combined all at once into a component or an overall system, rather than in stages.
Explain Peer Review in Software Testing?
What is Functional, Non-Functional, and Regression Testing used for (i.e. the purpose of each)?
What are the technical reviews?
what is system testing?
Which is the best institute in chennai to learn Softyware testing? Please help.
what is diff. between CMMI and CMM levels?
Is Database Testing a black box or white box type of testing?