Which of the following would contribute MOST to an effective
business continuity plan (BCP)? The BCP:
A. document was circulated to all interested parties.
B. planning involved all user departments.
C. was approved by senior management.
D. was audited by an external IS auditor.
Answer / guest
Answer: B
The involvement of user departments in the BCP is crucial
for the identification of the business processing
priorities. The BCP circulation will ensure that the BCP
document is received by all users, though essential, this
does not contribute significantly to the success of the BCP.
A BCP approved by senior management would not ensure the
quality of the BCP, nor would an audit necessarily improve
the quality of the BCP.
| Is This Answer Correct ? | 2 Yes | 0 No |
The MOST likely explanation for the use of applets in an Internet application is that: A. it is sent over the network from the server. B. the server does not run the program and the output is not sent over the network. C. they improve the performance of both the web server and network. D. it is a JAVA program downloaded through the web browser and executed by the web server of the client machine.
Which of the following would help to ensure the portability of an application connected to a database? The: A. verification of database import and export procedures. B. usage of a structured query language (SQL). C. analysis of stored procedures/triggers. D. synchronization of the entity-relation model with the database physical schema.
Which of the following is a measure of the size of an information system based on the number and complexity of a system?s inputs, outputs and files? A. Function point (FP) B. Program evaluation review technique (PERT) C. Rapid application design (RAD) D. Critical path method (CPM)
Which of the following goals would you expect to find in an organization's strategic plan? A. Test a new accounting package. B. Perform an evaluation of information technology needs. C. Implement a new project planning system within the next 12 months. D. Become the supplier of choice within a given time period for the product offered.
The IS auditor learns that when equipment was brought into the data center by a vendor, the emergency power shutoff switch was accidentally pressed and the UPS was engaged. Which of the following audit recommendations should the IS auditor suggest? A. Relocate the shut off switch. B. Install protective covers. C. Escort visitors. D. Log environmental failures.
While reviewing an ongoing project, the IS auditor notes that the development team has spent eight hours of activity on the first day against a budget of 24 hours (over three days). The projected time to complete the remainder of the activity is 20 hours. The IS auditor should report that the project: A. is behind schedule. B. is ahead of schedule. C. is on schedule. D. cannot be evaluated until the activity is completed.
Which of the following would allow a company to extend it?s enterprise?s intranet across the Internet to it?s business partners? A. Virtual private network B. Client-Server C. Dial-Up access D. Network service provider
An IS auditor's primary concern when application developers wish to use a copy of yesterday's production transaction file for volume tests is that: A. users may prefer to use contrived data for testing. B. unauthorized access to sensitive data may result. C. error handling and credibility checks may not be fully proven. D. full functionality of the new process is not necessarily tested.
The IS department of an organization wants to ensure that the computer files, used in the information processing facility, are backed up adequately to allow for proper recovery. This is a/an: A. control procedure. B. control objective. C. corrective control. D. operational control.
When reviewing a system development project at the project initiation stage, an IS auditor finds that the project team is following the organization's quality manual. To meet critical deadlines the project team proposes to fast track the validation and verification processes, commencing some elements before the previous deliverable is signed off. Under these circumstances, the IS auditor would MOST likely: A. report this as a critical finding to senior management. B. accept that different quality processes can be adopted for each project. C. report to IS management the team's failure to follow quality procedures. D. report the risks associated with fast tracking to the project steering committee.
Data edits are an example of: A. preventive controls. B. detective controls. C. corrective controls. D. compensating controls.
An IS auditor performing an access controls review should be LEAST concerned if: A. audit trails were not enabled. B. programmers have access to the live environment. C. group logons are being used for critical functions. D. the same user can initiate transactions and also change related parameters.