Which of the following would an IS auditor expect to find in
a console log?
A. Names of system users
B. Shift supervisor identification
C. System errors
D. Data edit errors
Answer / guest
Answer: C
System errors are the only ones that you would expect to
find in the console log.
| Is This Answer Correct ? | 5 Yes | 1 No |
Which of the following procedures can a biometric system perform? A. Measure airborne contamination. B. Provide security over physical access. C. Monitor temperature and humidity levels. D. Detect hazardous electromagnetic fields in an area.
After implementation of a disaster recovery plan (DRP), pre-disaster and post-disaster operational cost for an organization will: A. decrease. B. not change (remain the same). C. increase. D. increase or decrease depending upon nature of the business.
During an implementation review of a multiuser distributed application, the IS auditor finds minor weaknesses in three areas-the initial setting of parameters is improperly installed, weak passwords are being used and some vital reports are not being checked properly. While preparing the audit report, the IS auditor should: A. record the observations separately with the impact of each of them marked against each respective finding. B. advise the manager of probable risks without recording the observations, as the control weaknesses are minor ones. C. record the observations and the risk arising from the collective weaknesses. D. apprise the departmental heads concerned with each observation and properly document it in the report.
Losses can be minimized MOST effectively by using outside storage facilities to do which of the following? A. Provide current, critical information in backup files B. Ensure that current documentation is maintained at the backup facility C. Test backup hardware D. Train personnel in backup procedures
A company has contracted with an external consulting firm to implement a commercial financial system to replace its existing in-house developed system. In reviewing the proposed development approach, which of the following would be of GREATEST concern? A. Acceptance testing is to be managed by users. B. A quality plan is not part of the contracted deliverables. C. Not all business functions will be available on initial implementation. D. Prototyping is being used to confirm that the system meets business requirements.
The purpose of debugging programs is to: A. generate random data that can be used to test programs before implementing them. B. protect, during the programming phase, valid changes from being overwritten by other changes. C. define the program development and maintenance costs to be include in the feasibility study. D. ensure that program abnormal terminations and program coding flaws are detected and corrected.
During which of the following phases in systems development would user acceptance test plans normally be prepared? A. Feasibility study B. Requirements definition C. Implementation planning D. Post-implementation review
A vendor/contractor?s performance against service level agreements must be evaluated by the: A. customer. B. contractor. C. third-party. D. contractor?s management.
An IS auditor observed that some data entry operators leave their computers in the midst of data entry without logging off. Which of the following controls should be suggested to prevent unauthorized access? A. Encryption B. Switch off the computer when leaving C. Password control D. Screen saver password
The extent to which data will be collected during an IS audit should be determined, based on the: A. availability of critical and required information. B. auditor's familiarity with the circumstances. C. auditee's ability to find relevant evidence. D. purpose and scope of the audit being done.
Which of the following would be the LEAST helpful in restoring service from an incident currently underway? A. Developing a database repository of past incidents and actions to facilitate future corrective actions B. Declaring the incident, which not only helps to carry out corrective measures, but also improves the awareness level C. Developing a detailed operations plan that outlines specific actions to be taken to recover from an incident D. Establishing multidisciplinary teams consisting of executive management, security staff, information systems staff, legal counsel, public relations, etc., to carry out the response.
Which of the following would be the BEST method for ensuring that critical fields in a master record have been updated properly? A. Field checks B. Control totals C. Reasonableness checks D. A before-and-after maintenance report